(g)
VP-30
Secure the elevation as high as possible (approx. 100 mm)
A downhill grade of 1/100 or more
When constructing drain piping for several units, position the
common pipe about 100 mm below the drain outlet of each
unit as shown in the sketch. Use VP-30(11/4") or thicker pipe
for this purpose.
(d)
(e)The stiff PVC pipe put indoor side should be heat insulated.
(f) Avoid putting the outlet of drain hose in the places with irritant gas generated. Do not insert the drain hose directly into
drainage, where the gas with sulfur may be generated.
Because the drain spout is at the position, which negative
pressure may occur. So with the rise of water level in the drain
pan, water leakage may occur. In order to prevent water leakage,
we designed a backwater bend. The structure of backwater
bend should be able to be cleaned. As the right figure shown,
use T type joint. The backwater bend is set near the air
conditioner.
As figure shown, set a backwater bend in the middle of drain
hose.
Drainage Test
Conduct a drainage test after completion of the electrical work.
During the trial, make sure that drain flows properly through the piping and that no
water leaks from connections.
In case of a new building, conduct the test before it is furnished with the ceiling.
Be sure to conduct this test even when the unit is installed in the heating season.
Procedures
Supply about 1000 cc of water to the unit through the air outlet using a feed water pump.
Check the drain while cooling operation.
H1
H2
H1=100mm or the static pressure of
air sending motor
H2=1/2H1 (or between 50~100mm)
Drain hose
Stage
difference
part
Drain socket
Drain socket
Main unit
VP-25 joint
(field purchased)
Pipe cover(large)
[for insulation]
(accessory)
VP-25
(field purchased)
Pipe cover [for insulation]
(field purchased)
Drain hose
(accessory)
Pipe cover(small) [for insulation]
(accessory)
Clamp
(accessory)
Adhesion
For drain pipe, use hard PVC general purpose pipe VP-25(I.D.1")
which can be purchased locally. When connecting, insert a
PVC pipe end securely into the drain socket before tightening
securely using the attached drain hose and clamp. Adhesive
must not be used connection of the drain socket and drain
hose (accessory).
(c)
Drain piping should always be in a downhill grade (1/50~1/100) and avoid riding across an elevation or making traps.
When connecting the drain pipe to unit, pay suffcient attention
not to apply excess force to the piping on the unit side. Also,
fix the piping at a point as close as possible to the unit.
Good piping
1.5m ~ 2m
Suspension
bolts
Heat
insulation
A downhill grade
of 1/100 or more
(b)
Do not pipe under water
Keep free from traps
Avoid riding across an elevation
Air vent
Improper piping
(a)
(1)
(2)
(3)
(4)
(a)
(b)
Drain Piping
Installation Procedure
87
Содержание YHKJXH012BAM--FX
Страница 34: ...Model W D H L1 L2 L3 YHUJYH024BAR A X 860 308 730 633 113 5 340 YHUJYH024BAR A X 34...
Страница 36: ...YHFJZH012BAM AFX YHFJZH018BAM AFX YHFJZH024BAR AFX 3 33 100 22 1 1 0 1 0 0 33 36...
Страница 39: ...800 1320 830 1200 170 270 250 365 185 250 60 45 1105 4 758 2 15 88 YHGJXH048 60BAR GX YHEJXH028 36 48BAR GX 39...
Страница 93: ...YHUJYH024BAR A X power module YHUJYH028 36BAR A X power module 93...
Страница 94: ...YHUJYH028 36BAR A X filter board YHUJYH028 36 48BAR A X YHUJYH048BAS A X YHUJYH060BAS A X PCB 0151800054A 94...
Страница 95: ...YHUJYH048BAS A X YHUJYH060BAS A X power module YHUJYH048BAS A X YHUJYH060BAS A X filter board 95...
Страница 96: ...YHUJYH048BAR A X filter board YHUJYH048BAR A X power module 96...
Страница 111: ...5 2 Indoor unit 5 2 1 PCB 0151800106 for 28 36 48 60 indoor unit 111 YHDJXH018BAM GX...
Страница 151: ...151...