The following parameters may be accessed by means of the properties dialog of the VIPA
CPU.
n
Additional retentive memory
–
Here enter the number of retentive memory bytes. With 0 the value
‘Retentive memory
è
Number of memory bytes starting with MB0’
is set, which is
pre-set at the parameters of the Siemens CPU.
–
Range of values: 0 (default) ... 8192
n
Additional retentive timer
–
Enter the number of S7 timers. With 0 the value
‘Retentive memory
è
Number S7 timers starting with T0’
is set, which is pre-set at the parameters of
the Siemens CPU.
–
Range of values: 0 (default) ... 512
n
Additional retentive counter
–
Enter the number of S7 counter. With 0 the value
‘Retentive memory
è
Number S7 counters starting with C0’
is set, which is pre-set at the parameters
of the Siemens CPU.
–
Range of values: 0 (default) ... 512
n
Diagnostics interrupt (default: deactivated)
–
Diagnostics interrupt DI power section supply
Error: 3L+ (DC 24V DI power section supply) missing respectively <19V
–
Diagnostics interrupt DO power section supply
Error: 4L+ (DC 24V DO power section supply) missing respectively <19V
–
Diagnostics interrupt DO short circuit/overload
Error: Short circuit or overload of an digital output respectively current exceeds
0.5A.
n
OB 80 for timer interrupts
–
Here you can define at which timer interrupt OB the OB 80 (time error) is to be
called.
–
Range of values: Disabled (default), selection of the corresponding OB
n
PN MultipleWrite
–
In the activated state, parameter record sets are combined at PROFINET to one
or more Ethernet frames during the connection setup. This speeds up the connec-
tion setup, since a separate Ethernet frame is not used for each parameter record
set.
4.9 Project transfer
There is the following possibility for project transfer into the CPU:
n
Transfer via Ethernet
n
Transfer via memory card
n
Option: Transfer via MPI
Chap. 4.9.3 ‘Option: Transfer via MPI’ page 82
4.9.1 Transfer via Ethernet
So that you may access the according Ethernet interface you have to assign IP address
parameters by means of the "initialization".
n
X3/X4: Ethernet PG/OP channel
–
Chap. 4.6 ‘Hardware configuration - Ethernet PG/OP channel’ page 71
1.
For the transfer, connect, if not already done, the appropriate Ethernet port to your
Ethernet.
2.
Open your project with the Siemens SIMATIC Manager.
VIPA specific parameters
Overview
Initialization
Transfer
VIPA System MICRO
Deployment CPU M13-CCF0000
Project transfer > Transfer via Ethernet
HB400 | CPU | M13-CCF0000 | en | 18-50
81