23
4. Operating procedure
Auto stop operation
4 Starting operation
①
Use the
key to start operation.
The OPERATE (operating) lamp and the HEATER
(heater) lamp will come on and temperature control
starts.
※
You can use the
key to check the remaining
operation time/stop time information on the Bottom
screen.
※
Screen to check the remaining operation
time
※
Screen to check the operation stop time
P
ress the
key again or wait for about
10 seconds to return to the original status.
5 Cancelling operation
①
When the set time duration elapses or the time
comes, the Bottom screen will indicate [
END
] and
operation will stop.
②
Press the
key to eliminate the [
END
]
indication.
※
When you stop operation, the screen will return to
the one before starting operation.
Содержание FP102
Страница 67: ...64 12 Wiring diagram FP102 Wiring diagram Dotted line means optional parts ...
Страница 68: ...65 12 Wiring diagram FP302 Wiring diagram Dotted line means optional parts ...
Страница 69: ...66 12 Wiring diagram FP312 Wiring diagram Dotted line means optional parts ...
Страница 70: ...67 12 Wiring diagram FP412 Wiring diagram Dotted line means optional parts ...