13
4. Operating procedure
Prior confirmation
1. Check the power supply and the ground wire.
The specifications of the FP series are 115V and 220V.
Make sure to connect with this Equipment Power Cord/Power Cable to appropriate power
source and to ground definitely.
2. Check the ELB.
Check if the ELB functions properly.
See “Maintenance method” on P.54 Chapter 6.
Check ELB performance once a month or before continuous long-term operation.
Tick current time on Bottom Screen of Control Panel at ELB ON(
|
).
3. Check the Independent Overheat Preventive device.
Make sure to set IOPD temperature more than 100
℃
higher of Target Temperature in the
furnace.
Check IOPD performance before continuous long-
term operation. Refer to “Independent
Overheat Pre
vention Device” on page 48.
Содержание FP102
Страница 67: ...64 12 Wiring diagram FP102 Wiring diagram Dotted line means optional parts ...
Страница 68: ...65 12 Wiring diagram FP302 Wiring diagram Dotted line means optional parts ...
Страница 69: ...66 12 Wiring diagram FP312 Wiring diagram Dotted line means optional parts ...
Страница 70: ...67 12 Wiring diagram FP412 Wiring diagram Dotted line means optional parts ...