4 - 53
ENG
KICK AXLE AND SHIFT SHAFT
KICK AXLE AND SHIFT SHAFT
KICK AXLE AND SHIFT SHAFT
Extent of removal:
1
Kick axle removal
2
Shift shaft removal
Extent of removal
Order
Part name
Q’ty
Remarks
KICK AXLE AND SHIFT SHAFT
REMOVAL
Preparation for removal
Shift pedal link
Refer to “ENGINE REMOVAL” section.
Clutch
Refer to “CLUTCH AND PRIMARY
DRIVEN GEAR” section.
1
Kick axle assembly
1
Refer to “REMOVAL POINTS”.
2
Circlip
1
3
Washer
1
4
Kick idle gear
1
5
Washer
1
6
Circlip
1
7
Shift shaft
1
8
Circlip
1
9
Torsion spring
1
10
Bolt (stopper lever)
1
11
Stopper lever
1
12
Spring
1
13
Segment
1
Refer to “REMOVAL POINTS”.
1
2
Содержание TT-R125(S) 2003
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 49: ...GEN INFO MEMO...
Страница 179: ...INSP ADJ MEMO...
Страница 250: ...3 39 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 251: ...3 40 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 304: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 571: ...ELEC MEMO...
Страница 585: ...ELEC MEMO...
Страница 605: ...ELEC MEMO...
Страница 608: ......
Страница 609: ......
Страница 610: ...PRINTED IN JAPAN 2003 3 1 1 1 CR E F G PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...