4 - 18
ENG
CYLINDER HEAD
5. Install:
●
Timing chain tensioner
6. Turn:
●
Crankshaft
Counterclockwise several turns
7. Check:
●
Rotor “I” mark
Align with the crankcase stationary
pointer.
●
Camshaft match mark
Align with the cylinder head stationary
pointer.
Out of alignment
→
Adjust.
Installation steps:
●
While pressing the tensioner rod lightly
with fingers, use a thin screwdriver and
wind the tensioner rod up fully clockwise.
●
With the rod fully wound, install the gasket
1
and the chain tensioner
2
, and tighten
the bolts
3
to the specified torque.
T
R
.
.
Bolt (chain tensioner):
10 Nm (1.0 m • kg, 7.2 ft • lb)
●
Release the screwdriver, check the ten-
sioner rod to come out and tighten the
gasket
4
and the cap bolt
5
to the speci-
fied torque.
T
R
.
.
Cap bolt (timing chain tensioner):
8 Nm (0.8 m • kg, 5.8 ft • lb)
8. Tighten:
●
Bolt
1
NOTE:
Tighten the bolt while holding the rotor nut with
a wrench.
T
R
.
.
20 Nm (2.0 m · kg, 14 ft · lb)
Содержание TT-R125(S) 2003
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 49: ...GEN INFO MEMO...
Страница 179: ...INSP ADJ MEMO...
Страница 250: ...3 39 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 251: ...3 40 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 304: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 571: ...ELEC MEMO...
Страница 585: ...ELEC MEMO...
Страница 605: ...ELEC MEMO...
Страница 608: ......
Страница 609: ......
Страница 610: ...PRINTED IN JAPAN 2003 3 1 1 1 CR E F G PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...