2 - 34
SPEC
‰
Fasten the clutch cable with the
paint in the cable guide bottom
recess.
Ï
Pass the throttle cable and
starter cable through the cable
guide.
Ì
Fasten the starter motor lead.
Ó
Pass the engine oil breather
hose and overflow hose
between the right half of the
swingarm and frame.
È
Pass the negative battery lead
on the inside of the frame as
shown.
Ô
Fasten the engine oil breather
hose, overflow hose and air
vent hoses to 2 clicks.
After fastening the starter cable,
push it against the starter
plunger.
Ò
Put the tip of the air vent hose
into the frame.
˜
Install the primary coil terminal
(orange) to the ignition coil.
ˆ
Fasten the ground lead together
with the ignition coil.
1
2
3
4
5
6
7
8
9
0
6
A
B
C
6
D
E
F
G
ı
Î
‰
Ï
Ì
Ó
È
Ô
Ò
˜
ˆ
Ç
Å
CABLE ROUTING DIAGRAM
Содержание TT-R125(S) 2003
Страница 22: ...INDEX GENERAL INFORMATION SPECIFICATIONS REGULAR INSPECTION AND ADJUSTMENTS ENGINE CHASSIS ELECTRICAL...
Страница 49: ...GEN INFO MEMO...
Страница 179: ...INSP ADJ MEMO...
Страница 250: ...3 39 INSP ADJ Charging method using a variable voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 251: ...3 40 INSP ADJ Charging method using a constant voltage charger BATTERY INSPECTION AND CHARGING TT R125E TT R125LWE...
Страница 304: ...4 23 ENG CAMSHAFT AND ROCKER ARMS 5 Install Camshaft bearing holder 1 Bolt 2 T R 10 Nm 1 0 m kg 7 2 ft lb LT...
Страница 571: ...ELEC MEMO...
Страница 585: ...ELEC MEMO...
Страница 605: ...ELEC MEMO...
Страница 608: ......
Страница 609: ......
Страница 610: ...PRINTED IN JAPAN 2003 3 1 1 1 CR E F G PRINTED ON RECYCLED PAPER YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN...