4-16
POWR
TR
SECONDARY SHEAVE
INSTALLATION
1. Lubricate:
• Splines (fixed sheave)
2. Tighten:
• Secondary sheave bolt
3. Adjust:
• V-belt position
Refer to “DRIVE V-BELT” in CHAPTER 2.
• Sheave offset
• Secondary sheave free play (clearance)
Refer to “SHEAVE OFFSET ADJUSTMENT”
in CHAPTER 2.
Recommended grease:
ESSO beacon 325 grease or
Aeroshell grease #7A
T
R
.
.
Secondary sheave bolt:
64 Nm (6.4 m · kg, 46 ft · lb)
Содержание FX Nytro FX10X
Страница 2: ......
Страница 8: ......
Страница 63: ...INSP ADJ...
Страница 200: ...3 3 CHAS INSTALLATION 1 Install Headlight assembly 1 2 Headlight stay Installed position a 16 0 mm 0 63 in a 1 2 COVERS...
Страница 577: ...FI...
Страница 633: ...FI...
Страница 695: ...ELEC...
Страница 709: ...ELEC...
Страница 747: ...ELEC...
Страница 755: ...ELEC...
Страница 848: ...9 39 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7...
Страница 850: ...9 41 SPEC CABLE ROUTING G H I J K L L M A 0 0 0 B C D E H 9 F 1 1 2 3 4 5 6 9 O P L 2 6 1 M L 1 6 2 N M A A A A 8 7...
Страница 852: ...9 43 SPEC CABLE ROUTING 9 1 2 3 4 5 6 6 7 7 8...
Страница 854: ......
Страница 855: ......