Chapter 3
OPERATION
INSTALLATION
........................................3-1
Mounting the outboard motor ............3-2
PRE-OPERATION CHECKS
......................3-4
Checking the engine oil level...............3-6
BREAKING IN (RUNNING IN) ENGINE
..3-7
STARTING ENGINE
.................................3-8
WARMING UP ENGINE
.........................3-11
SHIFTING
................................................3-12
Forward................................................3-12
Reverse ................................................3-12
STOPPING ENGINE
...............................3-13
TRIMMING OUTBOARD MOTOR
.........3-14
Adjusting trim angle ...........................3-15
TILTING UP/DOWN
...............................3-18
SHALLOW WATER CRUISING
..............3-21
CRUISING IN OTHER CONDITIONS
.....3-22
Cruising in salt water..........................3-22
Cruising in turbid water .....................3-22
GB
62Y-9-78 (E,F,ES) 3A 5/25/00 4:10 PM Page 2
Содержание F40A
Страница 2: ...shiro A5 5 30 00 2 20 PM Page 1 ...
Страница 133: ... MEMO 62Y 9 78 E F ES 4A 5 25 00 4 16 PM Page 33 ...
Страница 139: ... MEMO 62Y 9 78 E F ES 4A 5 25 00 4 16 PM Page 39 ...
Страница 206: ...Chapter 6 INDEX INDEX 6 1 GB 62Y 9 78 E F ES 6 5 25 00 4 22 PM Page 2 ...
Страница 207: ...Chapitre 6 INDEX INDEX 6 1 Capítulo 6 INDICE INDICE 6 1 F ES 1 2 3 4 5 6 62Y 9 78 E F ES 6 5 25 00 4 22 PM Page 3 ...
Страница 214: ...shiro A5 5 30 00 2 20 PM Page 1 ...
Страница 215: ...shiro A5 5 30 00 2 20 PM Page 1 ...