BRKT
7-37
6885J11
Bracket unit
Checking the hydraulic pressure
1.
Check the hydraulic pressure. Check the
internal parts if out of specification.
2.
Fully extend the PTT rams.
3.
Loosen the pipe joints
1
, and then
remove the pipe joint
a
.
4.
Install the special service tool
2
.
NOTE:
9
Put the PTT unit in the drain pan.
9
Tighten the pipe joint of the tilt cylinder tem-
porarily, after remove the pipe joint
a
.
5.
Connect the PTT motor leads to the bat-
tery terminals to retract the trim rams,
and then measure the hydraulic pres-
sure.
6.
Reverse the PTT motor leads between
the battery terminals to fully extend the
rams.
7.
Remove the special service tool.
8.
Install the pipe joint, and then tighten
them to the specified torque.
68870590
2
1
a
68870610
L
G
68870600
L
G
PTT oil pressure gauge
assembly
2
: 90890-06580
Rams
PTT motor lead
Battery
terminal
Down
Green (G)
+
Blue (L)
-
Hydraulic pressure (down):
2.2–3.8 MPa (22–38 kgf/cm
2
)
Rams
PTT motor lead
Battery
terminal
Up
Blue (L)
+
Green (G)
-
Pipe joint:
15 N·m (1.5 kgf·m, 11.1 ft·lb)
6885J11_07b_1 07.10.1 9:03 Page 4
Содержание 55DEHD
Страница 4: ......
Страница 24: ...GEN INFO 1 19 6885J11 General information MEMO ...
Страница 85: ...6885J11 9 8 7 6 5 4 3 2 1 4 16 MEMO ...
Страница 154: ...LOWR 6 25 6885J11 Lower unit Shimming T3 M3 M2 68860480 T2 T1 M1 P R F ...
Страница 260: ... MEMO ...
Страница 261: ... MEMO ...