
POWR
5-37
6885J11
Power unit
3.
Install the ignition coils
0
, and then con-
nect the ignition coil leads
q
.
4.
Install the retainer
w
and pulser coil
assembly
e
, then install the stator
assembly
r
control link
t
.
5.
Connect the pulser coil coupler
y
, light-
ing coil leads
u
and charge coil coupler
i
.
6.
Install the Rectifier Regulator ground
lead
o
and PTT relay ground lead
p
(ET).
7.
Install the starter motor
a
, and then
tighten the starter motor mount bolts
s
to the specified torque.
8.
Install the spark plugs, tighten them tem-
porary tight, then to the specified torque
with a spark plug wrench.
0
q
B
/
W
B
6885013a
6885016a
t
e
w
r
6885011a
G
/
W
G
y
i
u
p
o
6885012a
s
a
68850166
Starter motor mount bolt
s
:
30 N·m (3.0 kgf·m, 22.1 ft·lb)
Ignition coil mount bolt:
7 N·m (0.7 kgf·m, 5.2 ft·lb)
Spark plug:
25 N·m (2.5 kgf·m, 18 ft·lb)
6885J11_05 07.9.26 15:44 Page 40
Содержание 55DEHD
Страница 4: ......
Страница 24: ...GEN INFO 1 19 6885J11 General information MEMO ...
Страница 85: ...6885J11 9 8 7 6 5 4 3 2 1 4 16 MEMO ...
Страница 154: ...LOWR 6 25 6885J11 Lower unit Shimming T3 M3 M2 68860480 T2 T1 M1 P R F ...
Страница 260: ... MEMO ...
Страница 261: ... MEMO ...