3/99
General Procedures/Information
5-26
Xerox DocuPrint N17 Service Manual
Output Test
HVPS (C. ROLL AC)
OPERATION
Tests the High Voltage Power Supply
(HVPS) AC voltage to the Charge Roll
Output Test
HVPS (C. ROLL DC)
OPERATION
Tests the High Voltage Power Supply
(HVPS) DC voltage to the Charge Roll
Output Test
HVPS (DEV. BIA DC)
OPERATION
Tests the High Voltage Power Supply
(HVPS) AC voltage to the Developer
Bias Charge Roll.
Output Test
HVPS (DEV.BIA AC)
OPERATION
Tests High Voltage Power Supply
(HVPS) DC voltage to the Developer
Bias Charge Roll.
Output Test
HVPS (DETACK SAW)
OPERATION
Tests High Voltage Power Supply
(HVPS) DC voltage to the Detack Saw.
Output Test
HVPS (T. ROLL- )
OPERATION
Tests High Voltage Power Supply
(HVPS) negative DC voltage to the Bias
Transfer Roll.
Output Test
HVPS (T. ROLL+ )
OPERATION
Tests High Voltage Power Supply
(HVPS) positive DC voltage to the Bias
Transfer Roll.
Output Test
EXIT DIAGNOSTICS
OPERATION
Exits the diagnostic test(s) currently run-
ning.
Output Test
ROM CHECKSUM
Displays the Print Engine Controller
ROM check sum.
Output Test
PAPER TRAY SIZE
OPERATION
Shows the paper size reported from
each Paper Size Sensor.
Test Type
LCD Display Message
Test Function
www.printcopy.info
www.printcopy.info
Содержание DocuPrint N17
Страница 26: ...6 98 Parts List 3 2 Xerox DocuPrint N17 Service Manual www printcopy info w w w p r i n t c o p y i n f o...
Страница 198: ...6 98 Wiring Data 6 2 Xerox DocuPrint N17 Service Manual www printcopy info w w w p r i n t c o p y i n f o...
Страница 250: ...6 98 Wiring Data 6 54 Xerox DocuPrint N17 Service Manual Notes www printcopy info w w w p r i n t c o p y i n f o...