Mounting and Anchoring the Units
152315 Rev C
3–5
Mounting and Anchoring the Units
To mount and anchor the PV100S:
1. Predrill the floor or pad to accept 1/2" diameter masonry anchors or ensure it
has pre-installed anchoring bolts that will fit the 5/8" mounting holes.
2. Lift the main inverter from beneath the lower enclosure with a forklift or
pallet jack as shown in Figure 3-2 on page 3–4. Move the Main Inverter
Enclosure into place.
3. Lift the AC interface/transformer assembly from beneath the enclosure with a
forklift or pallet jack as shown in Figure 3-2 on page 3–4. Move the AC
interface/transformer assembly into place.
4. Secure the Main Inverter Enclosure feet to the floor with a 1/2" diameter
anchor bolts.
5. Secure the AC interface/transformer assembly enclosure feet to the floor with
1/2" diameter anchor bolts.
Important:
Before proceeding with the installation, determine the location and layout
of the components, conduit penetration locations, conductor and conduit sizing, and
method for anchoring the unit. Ensure adequate space is provided for clearance for
ventilation and serviceability. Review Chapter 2, “Planning” if necessary before
proceeding.
Figure 3-3
Mounting Hole Locations
Mounting Holes for
securing and anchoring
the units.
Содержание PV100S-480
Страница 1: ...PV100S 100 kW Grid Tied Photovoltaic Inverter PV100S 208 PV100S 480 Planning and Installation Manual...
Страница 2: ......
Страница 3: ...PV100S 100 kW Grid Tied Photovoltaic Inverter Planning and Installation Manual...
Страница 8: ...vi...
Страница 14: ...xii...
Страница 18: ...xvi...
Страница 77: ...A Schematics Appendix A contains useful schematics to aid with installation...
Страница 78: ...Schematics A 2 152315 Rev C This page intentionally left blank...
Страница 79: ...Appendix A Schematics 152315 Rev C A 3 Figure A 1 Electrical Diagram sample...
Страница 80: ...Schematics Appendix A A 4 152315 Rev C Figure A 2 PV100S 480 Schematic for Main Power Distribution 152316 E1...
Страница 81: ...Appendix A Schematics 152315 Rev C A 5 Figure A 3 PV100S 480 Schematic for Control Power Distribution 152316 E2...
Страница 82: ...Schematics Appendix A A 6 152315 Rev C Figure A 4 PV100S 480 Schematic for Converter Control Unit 152316 E3...
Страница 83: ...Appendix A Schematics 152315 Rev C A 7 Figure A 5 PV100S 208 Schematic Main Power Distribution 152376 C1...
Страница 84: ...Schematics Appendix A A 8 152315 Rev C Figure A 6 PV100S 208 Schematic for Control Power Distribution 152376 C2...
Страница 85: ...Appendix A Schematics 152315 Rev C A 9 Figure A 7 PV100S 208 Schematic for Converter Control Unit 152376 C3...
Страница 86: ...Schematics Appendix A A 10 152315 Rev C This page was intentionally left blank...
Страница 89: ......