3.4.1 AC Connection
WARNING!
Danger to life due to electric shock!
The product must be grounded at the earthing bolt to establish a
potential equalization.
•
Provide earth connection before connecting to the AC/DC
power.
NOTICE
Connection with incorrect phase sequence causes errors when
connecting to the grid!
The phase sequence must be L1-L2-L3. Otherwise the product does
not connect to the grid.
•
Observe a clockwise rotating field.
Prerequisites:
•
All grid parameters must be fulfilled.
Procedure:
1.
Remove
the sliding ground plate.
2.
Dismount
the protective cover.
3.
Check
cable feeds for damage.
4.
Route
cable to the AC circuit breaker from below.
5.
Connect
the PE conductor to the mounting plate.
NOTICE: The cable lug must be suitable for M10 screw.
6.
Tighten
with a torque of
44 Nm
.
7.
Connect
the cable to the AC circuit breaker (Figure 12).
NOTICE: The correct
phase sequence
.
NOTICE: The cable lug must be suitable for a M12 screw.
8.
Tighten
with a torque of
75 Nm
.
9.
Mount
the protective cover.