Original Operating Instructions
BATI0XXX-ES-1-ZZZ-1
Installation
O_BATI_0XXX-ES-1-ZZZ-1_V1.4_GB
Seite
34
von
60
Variant 2:
Unbuffered supply voltage
Procedure:
1.
Remove
the sliding ground plate.
2.
Bridge
terminals:
(
–X9.1)
(
–X9.2)
(
–X9.3)
(
–X9.4)
3.
Connect
PE, L and N conductor of the
unbuffered supply voltage
to
terminal strip (
–X9):
PE conductor
(-X9.5)
L conductor
(-X9.1)
N conductor
(-X9.3)
Содержание BAT1200-ES-2-270-1
Страница 60: ......