Miscellaneous—Operational Checkout
Continued on next page
CN93077,000003A -19-16MAY13-31/53
Control Lever Pattern
Check—Backhoe Pattern
1
2
8
7
3
5
6
4
TX1093769 —UN—28JUN13
Control Lever Pattern Check - Backhoe Pattern
1— Arm Out
2— Arm In
3— Swing Left
4— Swing Right
5— Boom Down
6— Boom Up
7— Bucket Load
8— Bucket Dump
CAUTION: Prevent possible injury from unexpected machine movement.
Clear all persons from the area before operating machine.
Turn engine speed dial to L (slow idle) position.
Place pilot shutoff lever in unlocked (DOWN) position.
YES:
Go to next check.
Slowly move hydraulic levers to all positions.
NO:
See Control Lever
Pattern Operation. (Section
2-3.)
LOOK: Do bucket, boom, arm, and swing move according to pattern?
NO:
See your authorized
dealer.
4-2-24
092221
PN=229
Содержание 380GLC
Страница 6: ...Introduction Continued on next page TX JDEULA 19 11JUL16 2 3 TX1219046 UN 11JUL16 092221 PN 6...
Страница 7: ...Introduction TX JDEULA 19 11JUL16 3 3 TX1219047 UN 14JUL16 092221 PN 7...
Страница 9: ...Introduction DX EMISSIONS EPA 19 12DEC12 2 2 TS1721 UN 15JUL13 092221 PN 9...
Страница 13: ...Introduction Continued on next page DX EMISSIONS CARB 19 26AUG20 4 8 RG29281 UN 27FEB17 092221 PN 13...
Страница 16: ...Introduction Continued on next page DX EMISSIONS CARB 19 26AUG20 7 8 RG32758 UN 19AUG20 092221 PN 16...
Страница 17: ...Introduction DX EMISSIONS CARB 19 26AUG20 8 8 RG32759 UN 19AUG20 092221 PN 17...
Страница 24: ...Introduction 092221 PN 24...
Страница 287: ...Index Index 11 092221 PN 11...
Страница 288: ...Index Index 12 092221 PN 12...