![Worldwide Construction And Forestry Division 380GLC Скачать руководство пользователя страница 173](http://html1.mh-extra.com/html/worldwide-construction-and-forestry-division/380glc/380glc_operators-manual_998038173.webp)
Maintenance—Every 1000 Hours
ER79617,0000DED -19-22AUG12-1/1
Drain and Refill Swing Gear Case Oil
Specification
Swing Gear Case—Oil
Capacity......................................................................................... 11.8 L
3.1 gal.
1. Remove plug mounted on end of drain pipe to drain oil
into a container. Dispose of waste oil properly.
2. Install plug.
3. Remove filler cap (2), and add oil. See Swing Gear
Case and Travel Gear Case Oils. (Section 3-1.)
4. Install filler cap.
5. Check oil level on dipstick (1).
TX1001071A
—UN—02DEC05
Swing Gear Case
1— Dipstick
2— Filler Cap
3-9-1
092221
PN=173
Содержание 380GLC
Страница 6: ...Introduction Continued on next page TX JDEULA 19 11JUL16 2 3 TX1219046 UN 11JUL16 092221 PN 6...
Страница 7: ...Introduction TX JDEULA 19 11JUL16 3 3 TX1219047 UN 14JUL16 092221 PN 7...
Страница 9: ...Introduction DX EMISSIONS EPA 19 12DEC12 2 2 TS1721 UN 15JUL13 092221 PN 9...
Страница 13: ...Introduction Continued on next page DX EMISSIONS CARB 19 26AUG20 4 8 RG29281 UN 27FEB17 092221 PN 13...
Страница 16: ...Introduction Continued on next page DX EMISSIONS CARB 19 26AUG20 7 8 RG32758 UN 19AUG20 092221 PN 16...
Страница 17: ...Introduction DX EMISSIONS CARB 19 26AUG20 8 8 RG32759 UN 19AUG20 092221 PN 17...
Страница 24: ...Introduction 092221 PN 24...
Страница 287: ...Index Index 11 092221 PN 11...
Страница 288: ...Index Index 12 092221 PN 12...