If mains is back during the process, re-connecting
mains has priority.
The remaining time of each of the timers initiated is
shown in the display.
When started via “Remote Start (off Load)” input,
start procedures is the same as described below
but generator close relay is deactivated.
Because there is no mains control, only the part
"Start engine" (green background) is relevant.
Operation
START/STOP Operation > Start engine to supply load
37690A
easYgen-1800 | Genset Control
20
Содержание easYgen-1800
Страница 1: ...easYgen 1800 Operation Manual Genset Control easYgen 1800 37690A ...
Страница 10: ...General Information General Information Safety General Safety Notes 37690A easYgen 1800 Genset Control 10 ...
Страница 32: ...Appendix Alarms and Warnings Trip Alarms 37690A easYgen 1800 Genset Control 32 ...
Страница 36: ...37690A easYgen 1800 Genset Control 36 ...
Страница 37: ......