Änderungen vorbehalten!
Subject to change without notice!
Blatt/
sheet
PM.7.002883.EN.16
Datum/
date
23.01.2013
Stand/
version
23.01.2013
Geprüft/
approved
WAT/MZE
Overspeed governor EOS
Operating instructions
3.2.1
Installation in the machine room
Preparation
The governor can either be installed directly on the
machine room floor or on a support structure.
Lifts complying with EN81 require the rope
aperture to be kept as small as possible and
need to be fitted with a collar which is 50
mm high. A corresponding safety collar
must be fastened to the floor before instal-
lation takes place.
If a cement floor is to be poured over the
concrete after installation, bear this in mind
when fitting the collar.
Installation procedure
Always pay attention to the overspeed
governor’s rotational direction during each
stage of installation.
(
1
) If using a support base it must be screwed to
the governor.
(
2
) Put the governor (with or without base) into
correct position and align the plumb line over
the centre of the safety gear linkage.
(
3
) Mark the drill holes and put the stud anchor in
place (stud anchors are delivered with sup-
porting base).
(
4
) Fasten down the overspeed governor (with or
without supporting base).
Take care of tightening torque
Screw M10: 46Nm
Screw M12: 80Nm
3.2
Mechanical installation of the governor
(
1
)
(
3-4
)
(
2
)