background image

088-00

4

60706-207

    e.  Always avoid hot mufflers, exhaust manifolds,

 

and engine parts.  They can cause severe 

 

burns instantly.

     f.  Installing a generator set is not a “Do-it-your-

 

self” project.  Consult a qualified, licensed elec-

 

trician or contractor.  The installation must com-

 

ply with all national, state, and local codes.

TESTING POLICY 

Before any generator is shipped from the factory, it 

is fully checked for performance.  The generator is 

loaded to its full capacity, and the voltage, current 

and frequency are carefully checked.

Rated output of generator is based on engineering 

tests of typical units, and is subject to, and limited 

by, the temperature, altitude, fuel, and other condi-

tions specified by the manufacturer of the applicable 

engines.

INTRODUCTION AND 

DESCRIPTION 

The package standby system is designed to au-

tomatically provide standby power to unattended 

loads during electrical outages.  Upon interruption 

of normal electrical service, the packaged standby 

system electrical control circuits will automatically 

start the engine.  The generator will produce electri-

cal power and the Automatic Transfer Switch (ATS) 

will automatically transfer the electrical loads to the 

engine-generator set.  Upon restoration of normal 

electrical service the emergency transfer switch will 

sense return of the normal commercial power.  The 

Automatic Transfer Switch will transfer the load back 

to the normal commercial power source.  The engine 

control circuits will begin a cool-down cycle, after 

which the fuel supply will be shut off and the engine 

ignition system disabled.

These packaged standby systems consist of two 

major components:

1.  AUTOMATIC TRANSFER SWITCH

A wall mounted ASCO 85 Automatic Transfer 

Switch (ATS) designed for inside or outside instal-

lation.  The transfer switch is UL008 approved.  A 

seven day electronic exerciser circuit is installed 

in the ATS as standard equipment.  The ATS also 

contains the power failure sensing circuitry neces-

sary to start and stop the engine generator set.  The 

transfer switch is also equipped standard with a 3 

second start delay, and a 0 second transfer delay 

to allow the engine to warm up before transferring 

the load to the generator.  When the line power is 

restored the ATS has a 5 minute transfer delay to 

allow the incoming utility to stabilize before trans-

ferring back to line power and then an additional 2 

minute engine cool down delay before the engine 

shuts down.  Read and understand the ATS owners 

manual before installing, servicing or operating the 

transfer switch.

UL Automatic Transfer Switch Sizes

UNIT   

LINE SIDE 

GENERATOR

 

 

CONTACTOR  SIDE CONTACTOR

ULPSS15B2W 

00 AMPS 

00 AMPS

 

 

200 AMPS 

200 AMPS

Both the 00 amp and the 200 amp UL Switches are 

available in single phase only.

2.  ENGINE / GENERATOR

The engine generator set consists of a Briggs and 

Stratton, twin cylinder, four cycle air cooled engine.  

The engine is factory equipped to run on LP or NG 

fuel.  The engine operates at 3600 rpm and frequen-

cy regulation is maintained by the engine governor 

within 4 cycles variation (62.5 Hz - 58.5 Hz) from 

no load to rated load.  The generator is a brushless, 

single bearing, direct drive, rotating field design.  

The generator is connected to the engine’s tapered 

(quill) crankshaft extension.  The engine genera-

tor is mounted in a drip-proof enclosure for outside 

installation.  Connection boxes and terminal blocks 

are provided for all customer connections (both AC 

output and DC control).  A customer supplied 2 volt 

500 CCA (BCI group 26) battery is required to com-

plete the installation.

** NOTICE **

This unit will automatically transfer if a power outage 

occurs while running in an exercise mode.

Содержание ULPSS15B2E

Страница 1: ...11088 00 60706 207 INSTALLATION AND OPERATORS MANUAL PACKAGED STANDBY SYSTEM ULPSS15B2W E...

Страница 2: ...l Pressure Tables 8 Fuel Conversions 8 Battery Installation 9 Connecting Battery Charger 11 TRANSFER SWITCH INSTALLATION AC Electrical Connections 11 12 DC Electrical Connections 13 INITIAL START UP 1...

Страница 3: ...ground rod driven into the earth 2 FIRE HAZARD Natural gas and L P present a hazard of possible explosion and or fire a Keep fuel containers out of reach of children b Do not smoke or use open flame...

Страница 4: ...r inside or outside instal lation The transfer switch is UL1008 approved A seven day electronic exerciser circuit is installed in the ATS as standard equipment The ATS also contains the power failure...

Страница 5: ...sfer switch The installation must comply with all national state and local codes Before beginning the installation process check the rating of the generator set and its transfer switch rating Be certa...

Страница 6: ...to the fuel solenoid on the unit must be four to six ounces psi per square inch or 7 to 11 inches W C water column These fuel pressures are critical failure to provide the proper pressure can cause ma...

Страница 7: ...led FEET SIZE OF PIPE up to 25 FT 3 4 Pipe 25 100 FT 1 Pipe over 100 FT Consult Factory Allow an additional 3 feet for each standard elbow Do not use street ells restrictive WARNING PERSONAL DANGER Do...

Страница 8: ...ed LP tank size for LP Vapor withdrawal operating at various outside temperatures given in degrees Fahrenheit Celsius TANK TEMPERATURE TANK SIZE 60 F 16 C 150 GALLON 32 F 0 C 250 GALLON 0 F 18 C 500 G...

Страница 9: ...disconnect the nega tive cable first and then the positive cable 5 Be sure all connections are tight and coat the terminals and cable ends with dielectric grease WARNING The electrolyte is a diluted s...

Страница 10: ...11088 00 10 60706 207...

Страница 11: ...that this circuit be fused for 15 amps Terminal block connections have been provided in the customer connection area of the engine generator set See Page 10 for diagram NOTICE The battery tender is no...

Страница 12: ...are removed from main distribution panels and reinstalled in the emer gency distribution panel Suggested circuits freez er refrigerator furnace emergency lights sump pump emergency outlet circuits etc...

Страница 13: ...ative White INITIAL START UP WARNING DO NOT jump start these engine generator sets Starting these units on a low battery of jump start ing them will cause damage to the engine control module Use the f...

Страница 14: ...ote start WILL NOT occur AUTO White Button This button places the module into its Automatic mode This mode allows the module to control the function of the generator automatically The module will moni...

Страница 15: ...l block in the ATS The voltage should be 240 volts plus or minus nominal The frequency should be between 61 5 to 62 hertz Hz The voltage should also be checked between the hot terminals L2 and L6 and...

Страница 16: ...s for control of the ATS and the generator PUSH BUTTONS On the front control display are three push buttons that control the operation of the generator and the ATS CAUTION Before using the transfer te...

Страница 17: ...ctuator Actuator Position clock battery off S2 10 on up off down exerciser off S1 7 on up off down with load or without load without load S1 8 with up without down SETTING THE EXERCISER CIRCUIT Press...

Страница 18: ...11088 00 18 60706 207...

Страница 19: ...s 4 to select the next parameter or 3 to select the previous parameter within the current page When viewing the parameter to be changed press the button The value begins to flash Press 4 or 3 to adjus...

Страница 20: ...ule detects that the engine oil temperature has exceeded the high engine temperature pre alarm setting level after the Safety On timer has expired UNDERSPEED The engine speed has fallen below the unde...

Страница 21: ...MAINTENANCE Reasonable care in preventive maintenance will insure high reliability and a long life for the engine generator set and Automatic Transfer Switch WARNING When performing any type of mainte...

Страница 22: ...11088 00 22 60706 207 ENGINE GENERATOR SET LAYOUT ULPSS15B2W E...

Страница 23: ...23 11088 00 60706 207 ENGINE GENERATOR SET PAD LAYOUT...

Страница 24: ...ked up engine generator set 9 Defective starter fuel solenoid relay s ENGINE CRANKS BUT WILL NOT START 1 Improper fuel pressure being delivered to unit 2 Fuel supply shut off 3 Fuel supply empty 4 Def...

Страница 25: ...25 11088 00 60706 207 AC AND DC GENERATOR SCHEMATIC...

Страница 26: ...11088 00 26 60706 207 MAINTENANCE LOG DATE HOURS ITEM WORK PERFORMED...

Страница 27: ...27 11088 00 60706 207 MAINTENANCE LOG DATE HOURS ITEM WORK PERFORMED...

Страница 28: ...nd fitness for a particular purpose are limited to 12 months or 1000 hours which ever occurs first from date of purchase In no event is WINCO liable for incidental or conse quential damages Note Some...

Отзывы: