background image

Installation and operating instructions Wilo-Sevio AIR D

 

19

TRANSPORTATION AND STORAGE English

3.7.  Scope of delivery

• 

Air distributor with flange connection for the inlet 

pipe

• Aerator pipes

• Drainage connection

• Connecting sleeves and T-connectors

• Base support

• Fixation material

• Drilling plan for the base supports

• Overview and layout of the individual compo-

nents

3.8.  Material to be provided by the customer

• Inlet pipe for air supply

• Fan or compressor

• Drainage pipe with stop valve

4.  Transportation and storage

On delivery, check immediately that the ship-

ment is complete and undamaged. If any parts 

are damaged or missing, the transport company 

or the manufacturer must be notified on the day 

of delivery. Claims made after this date cannot be 

recognised. Damage to parts must be noted on 

the freight documentation.

4.1.  Transport

Only the designated and approved fastening 

devices, transportation and lifting equipment 

may be used for transportation. These must have 

sufficient load-bearing capacity to ensure that an 

aerator field and its accessories can be trans

-

ported safely.

The personnel must be qualified for the tasks and 

must follow all applicable national safety regula-

tions during the work.

4.2.  Storage

• The individual components must be stored in 

their original packaging.

• The store room must be dry and frost-proof. We 

recommend storage in a ventilated room with a 

temperature that is maintained b5 °C 

and +25 °C. The temperature must not exceed 

+50 °C. The relative humidity may not be higher 

than max. 65 %.

• The components must also be protected from 

direct sunlight. The distance from heat sources 

must be at least 1 m

• Furthermore, the components must not come 

into contact with hot sparks (welding work, 

cigarettes, etc.) or be stored near solvents, oils, 

chemicals or acids.

5.  Installation

In order to prevent damage to the product or seri-

ous injury during installation, the following points 

must be observed:

• Installation work – assembly and installation of 

the aerator field – may only be carried out by 

qualified persons. The safety instructions must be 

followed at all times.

• The components of the aeration system must be 

inspected for transport damage before carrying 

out any installation work.

5.1.  General

For design and operation of technical sewage sys-

tems, observe the pertinent local regulations and 

directives for sewage technology (such as those 

of the German Association for Water, Wastewater 

and Waste).

The following information must be observed 

when installing the aeration system:

• 

This work must be performed by qualified per

-

sonnel.

• Check that the available design documentation 

(installation plans, layout of the operating space, 

drilling plan) is complete and correct.

• Also refer to all regulations, rules and laws for 

working with heavy and suspended loads.

• Wear appropriate protective equipment.

• Please also observe the applicable national acci-

dent prevention regulations and trade association 

safety provisions.

DANGER of falling! 

During installation, work is sometimes 

performed directly at the edge of the basin. 

Carelessness or wearing inappropriate cloth

-

ing could result in a fall. There is a risk of fatal 

injury! Take all necessary safety precautions 

to prevent this.

DANGER due to toxic substances! 

During work in an environment hazard-

ous to health, e.g., in sewage or wastewater 

treatment plants, there is an increased risk 

due to bacteria and viruses. To mitigate the 

increased risk, heed the following points:

•  Open wounds must be cleaned and treated 

immediately!

•  Eating and drinking is strictly prohibited!
•  Appropriate protective equipment must be 

worn!

•  Disinfect persons and tools when leaving the 

unit!

5.2.  Installation types

• 

Aerator field is anchored securely to the bottom 

of the basin.

5.3.  Operating space

• The operating space must be clean, free of coarse 

solids, dry, frost-free and, if necessary, decon-

taminated.

• During any work in pump chambers, a second 

person must be present for safety reasons.

• Take the necessary countermeasures if there is a 

risk of toxic or suffocating gases collecting.

• The set-down location must have a solid bear-

ing surface and be designed appropriately and 

dimensioned large enough, so that the entire 

load can be unloaded and stored according to 

specifications in the section “Transportation and 

Содержание Wilo-Sevio AIR D

Страница 1: ...02 06 2016 WH Pioneering for You Wilo Sevio AIR D de Einbau und Betriebsanleitung en Installation and operating instructions es Instrucciones de instalaci n y funcionamiento hu Be p t si s zemeltet s...

Страница 2: ......

Страница 3: ...4 Funktion 6 3 5 Typenschl ssel 7 3 6 Technische Daten 7 3 7 Lieferumfang 7 3 8 Bauseits zustellendes Material 7 4 Transport und Lagerung 7 4 1 Transport 7 4 2 Lagerung 7 5 Aufstellung 7 5 1 Allgemei...

Страница 4: ...ch auf die im Titelblatt angegebenen Bel fter 1 5 Gew hrleistung Generell gelten bez glich Gew hrleistung die Angaben laut den aktuellen Allgemeinen Ge sch ftsbedingungen AGB Diese finden Sie hier www...

Страница 5: ...Symbol f r Gebot z B K rperschutz tragen Die verwendeten Zeichen f r die Sicherheits symbole entsprechen den allgemein g ltigen Richtlinien und Vorschriften z B DIN ANSI Sicherheitshinweise die nur au...

Страница 6: ...en Die zugef hrte Luft darf eine max Temperatur von 60 C haben bei h heren Temperaturen halten Sie bitte R cksprache mit dem Wilo Kun dendienst muss frei von l Staub und L sungs mitteln sein Staubfilt...

Страница 7: ...nde Tragf higkeit und Tragkraft besitzen damit ein Bel fterfeld und dessen Zubeh rteile gefahrlos transportiert werden k nnen Das Personal muss f r diese Arbeiten qualifiziert sein und muss w hrend de...

Страница 8: ...g in Form von Abmessungen Festigkeit und Belastbarkeit ist der Betreiber bzw der jewei lige Zulieferer verantwortlich 5 3 1 Bauseits zustellendes Material Zulaufleitung f r Luftzufuhr Das Bel fterfeld...

Страница 9: ...r bundanker und Befestigen Sie die Halterung mit einer Scheibe und Sechskantmutter 5 Drehen Sie pro Gewindestange zwei Sechskant muttern auf stecken Sie jeweils eine Unterleg scheibe auf und stecken S...

Страница 10: ...halten und berpr ft werden Kompressor Gebl se hat eine ausreichende Leis tung f r die erforderliche Luftzufuhr Druck in der Zulaufleitung entspricht der Vorgabe und bleibt konstant Verrohrung ist abso...

Страница 11: ...eist kann die Anlage in Betrieb gehen Nachdem auch der zweite Funktionstest erfolg reich abgeschlossen wurde muss der Betriebs raum geflutet werden Sollte die Inbetriebnahme noch nicht m glich sein mu...

Страница 12: ...grund abstellen und ge gen Umfallen sichern Bauteile vor direkter Sonneneinstrahlung sch t zen um der Verspr dungsgefahr der Kunststoff teile vorzubeugen Beachten Sie hierzu auch das Kapitel Transport...

Страница 13: ...rt werden Die Wartungsintervalle m ssen entsprechend der Beanspruchung des Bel ftersystems festge legt werden Unabh ngig von den festgelegten Wartungsintervallen ist eine Kontrolle des Bel f tersystem...

Страница 14: ...olen Sie diese Schritte 3 4 mal Der max zul ssige Wert f r die Beaufschlagung darf nicht berschritten werden Da diese Wartungsma nahme erheblich zur Funktionssicherheit und Effizienz der Anlage beitr...

Страница 15: ...nction 18 3 5 Type key 18 3 6 Technical data 18 3 7 Scope of delivery 19 3 8 Material to be provided by the customer 19 4 Transportation and storage 19 4 1 Transport 19 4 2 Storage 19 5 Installation 1...

Страница 16: ...be given priority 1 5 1 General The manufacturer is obliged to correct any de fects found in the aerator it sells provided that the defects meet one or more of the following requirements The defects a...

Страница 17: ...ng faeces activated sludge with bacteria etc particular caution must be taken Open wounds must be cleaned and treated immediately Eating and drinking is strictly prohibited Appropriate protective equi...

Страница 18: ...mponents 3 3 1 Pipework The pipework consists of individual pipes made of stainless steel or plastic Here a distinction is made between the air distributor and the pipes for the aerator lines The air...

Страница 19: ...ersons The safety instructions must be followed at all times The components of the aeration system must be inspected for transport damage before carrying out any installation work 5 1 General For desi...

Страница 20: ...the installation check the operat ing space to see if it is prepared accordingly for the installation The configuration of the system as well as the installation and drilling plans are in line with th...

Страница 21: ...the outside of the pipe ends of the aera tor pipe as well as the inside of the connecting sleeves with a liquid soap solution no grease or oil 4 Slide the connecting sleeves onto an aerator pipe as fa...

Страница 22: ...must be present in the basin and drain the aerator fields during the function test A visual inspection from the corners or outside the operating space is not permitted 1 Before water is introduced int...

Страница 23: ...a 10 minute test run with maximum loading must be per formed daily 7 2 Decommissioning for maintenance work and or storage The system must be switched off and secured against being switched on again w...

Страница 24: ...media hazard ous to health must be decontaminated In addi tion make sure that no gases that are hazardous to health form or are present DANGER due to toxic substances During work in an environment haz...

Страница 25: ...drainage pipe during the test run The air supply in the aeration system causes water condensate that may be present to discharge via the drainage pipe 8 2 3 Cleaning the diaphragm surface During opera...

Страница 26: ......

Страница 27: ...C digo 31 3 6 Datos t cnicos 31 3 7 Suministro 31 3 8 Material que corre a cargo del propietario 31 4 Transporte y almacenamiento 31 4 1 Transporte 31 4 2 Almacenamiento 31 5 Instalaci n 31 5 1 Genera...

Страница 28: ...de venta actualizadas Estas pueden consultarse en www wilo com legal Cualquier divergencia al respecto deber es tipularse contractualmente y d rsele un trato prioritario 1 5 1 Generalidades El fabrica...

Страница 29: ...os s mbolos de segu ridad cumplen con las directivas y normativas de validez general p ej DIN ANSI Las indicaciones de seguridad que solo hacen referencia a da os materiales aparecen en color gris y s...

Страница 30: ...re introducido debe tener una temperatura m x de 60 C en caso de temperaturas supe riores consultar con el servicio t cnico de Wilo y debe estar libre de aceite polvo y disolventes Los filtros de polv...

Страница 31: ...elevaci n previstos y homologados Deben tener una capacidad de carga suficiente para poder trans portar con seguridad una parrilla de aeraci n y sus correspondientes accesorios El personal debe estar...

Страница 32: ...la carga no se desplace durante el transporte Los elementos constructivos y los cimientos deben tener la suficiente resistencia como para permitir una fijaci n segura que garantice el funcionamiento E...

Страница 33: ...de marca y coincidir con el esquema de perforaciones enviado ya que en caso contrario pueden surgir torsiones durante el montaje 2 Limpiar las perforaciones exhaustivamente p ej aspir ndolas 3 Instale...

Страница 34: ...r la tuber a cerrarla de nuevo por completo 7 Girar el difusor de plato hasta el tope en los so portes de fijaci n 6 Puesta en marcha El cap tulo Puesta en marcha contiene todas las instrucciones impo...

Страница 35: ...aso se aumenta el nivel de agua hasta aprox 10 cm por encima de la uni n por bridas del distribuidor de aire y el tubo de entrada Compruebe la estanqueidad del distribuidor de aire y de la conexi n de...

Страница 36: ...ecesario llevar los equipamientos de pro tecci n correspondientes en cada caso Al abandonar la instalaci n es necesario desin fectar a las personas y las herramientas 7 2 1 Desmontaje El desmontaje se...

Страница 37: ...ridas abiertas deben limpiarse y tratarse inmediatamente Est prohibido ingerir comida o bebida en todo momento Es necesario llevar los equipamientos de pro tecci n correspondientes en cada caso Al aba...

Страница 38: ...desag e durante la puesta en funcionamiento Debido a la entrada de aire en el sistema de ventilaci n se evacua agua condensados existentes a trav s de la tuber a de desag e 8 2 3 Limpieza de la super...

Страница 39: ...M k d s 42 3 5 A t pusjel magyar zata 42 3 6 M szaki adatok 43 3 7 Sz ll t si terjedelem 43 3 8 Az gyf l ltal biztos tand anyagok 43 4 Sz ll t s s rakt roz s 43 4 1 Sz ll t s 43 4 2 T rol s 43 5 Tele...

Страница 40: ...an ltal noss gban az lta l nos Szerz d si Felt telek SZF c m doku mentum aktu lis v ltozat ban szerepl inform ci k rv nyesek Ezt itt tal lja meg www wilo com legal Az ett l val elt r seket szerz d sb...

Страница 41: ...bet sz nnel szedt k s biztons gi jel n lk l jelennek meg 2 2 ltal nos biztons gi el r sok A diff zor medenc be t rt n be ill kiszerel s t tilos egyed l v gezni Mindig jelen kell lennie egy m sodik sz...

Страница 42: ...las vagy m s finomsz las anyagb l k sz lt sz r k s szigetel anyagok haszn lata tilos A grafitlamell s forg tolatty s szelepeket nyom oldalon l gsz r vel kell ell tni Ezek az sszetev k a membr n elt m...

Страница 43: ...szeket az eredeti csomagol sban kell t rolni A t rol helyis gnek sz raznak s fagymentesnek kell lennie 5 C s 25 C k z tti h m rs klet j l szell z helyis gben val t rol st javaslunk A h m rs klet nem...

Страница 44: ...ke reszt l csatlakozik a bet pl l vezet khez A be t pl l vezet k helyzet n a megrendel s lead sa ut n m r nem lehet m dos tani mert k l nben ez probl m kat okozhat a telep t s sor n Ezen k v l a bet p...

Страница 45: ...nden egyes cs vet pontosan v zszintesen kell be ll tani s minden leveg ztet fel letenek ugyanabban a magass gban kell lennie A meden cefen k s a cs tart k z tti sz ks ges t vols got a m retez si terve...

Страница 46: ...ndszer zembe helyez s t kiz r lag szakk pzett s betan tott szem lyek v gezhetik a biztons gi el r sok betart sa mellett A leveg ztet rendszert kezel szem lyzet vala mennyi tagj nak meg kell kapnia el...

Страница 47: ...d s ellen rz s sikeres elv gz se ut n a rendszer zembe helyezhet Ehhez a leveg z tet st egy k l n az p ttet ltal biztos tand kezel helyen kell bekapcsolni Alapvet en itt csak a Be s Ki zem llapotok k...

Страница 48: ...valamint a tiszt t si s karbantart si munk k sor n viselt v d ruh za tot a TA 524 02 hullad kk d s a 91 689 EGK ir nyelv ill a helyi ir nyelvek szerint kell rtal matlan tani 7 4 2 Term k A term k el...

Страница 49: ...llen rz se Karbantart si m veletek a l gs r t k n bef v kon Sz r csere a leveg bevezet sben 8 1 2 Zord zemi k r lm nyekre vonatkoz id k z k Zord zemi k r lm nyek eset n a megadott karbantart si id k z...

Страница 50: ...csolatban l pjen kapcso latba a kezel hely gy rt j val 8 2 4 Membr nok fel let nek mechanikus tiszt t sa 1 Leveg ztet fel let kikapcsol sa 2 Medence leereszt se 3 Medence s diff zor lemos sa nagynyom...

Страница 51: ......

Страница 52: ...Pioneering for You WILO SE Nortkirchenstra e 100 44263 Dortmund Germany T 49 0 231 4102 0 F 49 0 231 4102 7363 wilo wilo com www wilo com...

Отзывы: