WIDOS
Einsteinstr. 5
Phone
++49 7152 9939 0
Wilhelm Dommer Söhne
D-71254 Ditzingen-Heimerdingen
Fax
++49 7152 9939 40
GmbH
website: http://www.widos.de email:
12.05.15
Working Instructions WIDOS 6113
Page 34 of 67
8.
Transport
The machine can be transported in two transport boxes or in one packing box.
One transport box contains the basic machine, the aggregate and the reception box with planer and heating
element, the other box contains the reduction inserts.
In each box holders are included which are suitable for each single component in order to avoid slipping.
- Put the components into the box in such a way that they fit into the holders.
The hydraulic hoses at the basic machine should not be unscrewed (air penetration).
- Make sure that they are not squeezed.
Handle the machine carefully.
- Do not tilt the aggregate too much. Otherwise there is the danger that oil may come out.
- Protect the machine from heavy shocks.
- Make sure that the box cover is closed correctly.
During the construction of the transport box a stress was put on a light-weight construction.
- Take much care when using automatic handling and carrying machines.
During the transport of the machine there may be cold
weldings between the piston rod and the eyes of the planer
housing. These spots on the piston rod may damage the
sealing.
For machines with lifting device (option).
Lift the lifting device out of the holder from above for a transport.
If necessary disconnect the crane motor from the crane mast by demounting the suspension bracket on
the crane motor.
Therefore the eyes must be lubricated with PTFE spray before each transport!
Suspension bracket
Crane mast
Содержание 6113 mobile
Страница 28: ...Welding Log and Tables Chapter 6 12 05 15 Working Instructions WIDOS 6113 Page 28 of 67...
Страница 41: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 37 of 67...
Страница 42: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 38 of 67...
Страница 43: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 39 of 67...
Страница 44: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 40 of 67...
Страница 45: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 41 of 67...
Страница 46: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 42 of 67...
Страница 47: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 43 of 67...
Страница 48: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 44 of 67...
Страница 50: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 46 of 67...
Страница 51: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 47 of 67...
Страница 52: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 48 of 67...
Страница 53: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 49 of 67...
Страница 54: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 50 of 67...
Страница 55: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 51 of 67...
Страница 56: ...Hydraulic and electric diagrams Chapter 9 12 05 15 Working Instructions WIDOS 6113 Page 52 of 67...