Kunststoffschweißtechnik
Starting and operating
Chapter 5
14.01.2015 Working
Instructions
WIDOS 4002 S CNC 3.0
Page 28 of 92
Swivel planer into the basic machine and
hook on
absolutely
(draw
forward handle of planer).
Noise exceeding 80 dB (A) may occur; during planing it is
obligatory to wear ear protection!
Keep <Planer>-button pressed until a revolving chip is lying around the
pipe ends 2-3 times and until pipe ends are plan.
Take care not to plan too far because there is the danger of damaging the
clamping tools with the planer.
Display:
2
nd
line:
planer working
Ps=000 Pi=000 P
0
=0.0
During the planing process, the desired, actual and
drag pressures are displayed
If planing pipes are finished, release the button <Planer>.
Display:
2
nd
line:
alignment check
start planer
Unlock the planer and swing it out of the machine,
then remove the produced cuttings
You may continue planing the pipes by the button <Planer>.
In order to start the alignment check, unlock the planer and swing it into
the machine.
Then remove the chips without touching the machined.
Press button <Start>: alignment check starts.
Display:
2
nd
line:
closing machine
Slide closes
after a few seconds, the display changes
Display:
2
nd
line:
confirm alignment
test pressure
Check the alignment of the pipes. The misalignment may not be higher
than 10 % of the wall thickness; the admissible gap must not exceed 0.5
mm.
Either:
The alignment of the pipes is correct
confirm with button <Start>.
Or:
If the misalignment is too high, re-adjust the pipe ends in the basic
clamping devices and repeat the planing process (from:
).
Or:
Keep pressed button <+> to check the pressure build-up (e.g. whether
pipes slip through).