background image

20

CABLE DIAGRAM

The cable diagram below shows the proper routing of the Long Cable (41) and the Short Cable (42). Use the

diagram to make sure that the two cables, the cable traps, and the pulley covers have been assembled correct-

ly. If the cables have not been correctly routed, the weight system will not function properly and damage may

occur. The numbers show the correct route for each cable. The starting and ending points of each cable are

labelled. Make sure that the cable traps and pulley covers do not touch or bind the cables.

4

3

2

7

6

5

4

3

2

Weight Stack—8

1—Low Pulley

1—High Pulley

Long Cable (41) 

5—Long “U”-Bracket

Short Cable (42)

TOP VIEW

5

Make sure you have the following tools:

• two adjustable wrenches
• one standard screwdriver
• one phillips screwdriver
• one rubber mallet
• You will also need grease or petroleum jelly, and a

small amount of soapy water.

Note: Assembly will be more convenient if you have

a socket set, a set of open-end or closed-end

wrenches, or a set of ratchet wrenches.

How to Identify Parts

To help you identify the small parts used in assembly,

we have included a PART IDENTIFICATION CHART

in the centre of this manual. Place the chart on the

floor and use it to easily identify parts during each

assembly step. Note: Some small parts may have

been pre-attached. If a part is not in the parts

bag, check to see if it has been pre-attached. 

How to Orient Parts

As you assemble the weight system, make sure that

all parts are oriented exactly as shown in the draw-

ings. 

Tightening Parts

Tighten all parts as you assemble them, unless

instructed to do otherwise. 

Questions?

If you have questions after reading the assembly

instructions, please call our Customer Service

Department at 08457 089 009.

Assembly Requires Two Persons

For your convenience and safety, assemble the

weight system with the help of another person.

Set Aside Enough Time

Due to the many features of the weight system, the

assembly process will take a few hours. By setting

aside plenty of time and by deciding to make the

task enjoyable, assembly will go smoothly. You may

want to assemble the weight system over a couple

of evenings.

Select a Location for the Weight System

Because of its weight and size, the weight system

should be assembled in the location where it will be

used. Make sure that there is enough room to walk

around the weight system as you assemble it.

How to Unpack the Box

To make assembly as easy as possible, we have

divided the assembly process into four stages. The

parts needed for each stage are found in individual

bags. Important: Wait until you begin each stage

to open the parts bag for that stage. Place all

parts of the weight system in a cleared area and

remove the packing materials. Do not dispose of

the packing materials until assembly is completed.

Make Assembly Easier for Yourself

Everything in this manual is designed to

ensure that the weight system can be assem-

bled successfully by anyone. Before begin-

ning assembly, make sure to read the

information on this page. This brief intro-

duction will save you much more time than

it takes to read it. 

The Four Stages of the Assembly Process

Frame Assembly—You will begin by assembling

the base and the uprights that form the skeleton of

the weight system.
Arm Assembly—During this stage you will

assemble the arms and the leg lever.

Cable Assembly—During this stage you will

attach the cables and pulleys that connect the

arms to the weights. 
Seat Assembly—During the final stage you will

assemble the seat and the backrest.

ASSEMBLY

Содержание SPARRING SYSTEM

Страница 1: ...DERING REPLACEMENT PARTS To order replacement parts contact the ICON Health Fitness Ltd office or write ICON Health Fitness Ltd Unit 4 Revie Road Industrial Estate Revie Road Beeston Leeds LS118JG UK...

Страница 2: ...egistered trademark of ICON Health Fitness Inc MONDAY Date EXERCISE WEIGHT SETS REPS EXERCISE WEIGHT SETS REPS EXERCISE WEIGHT SETS REPS AEROBIC EXERCISE AEROBIC EXERCISE TUESDAY Date WEDNESDAY Date T...

Страница 3: ...Deltoid shoulder R Triceps back of arm S Latissimus Dorsi mid back T Spinae Erectors lower back U Gluteus Medius hip V Gluteus Maximus buttocks W Hamstring back of leg X Gastrocnemius back of calf 3 W...

Страница 4: ...stance WEIGHT LOSS To lose weight use a low amount of resistance and increase the number of repetitions in each set Exercise for 20 to 30 minutes resting for a maximum of 30 seconds between sets CROSS...

Страница 5: ...ns please call our Customer Service Department at 08457 089 009 Assembly Requires Two Persons For your convenience and safety assemble the weight system with the help of another person Set Aside Enoug...

Страница 6: ...44 41 25 83 6 1 1 Holes 2 9 2 65 97 92 69 39 39 3 55 84 92 Hole 92 84 97 28 1 2 83 5 3 58 55 Frame Assembly 1 Before beginning assembly make sure that you have read and understand the information in t...

Страница 7: ...ner Caps 59 into the top of the crossbar Attach the Top Frame 10 to the Front Upright 4 and the Rear Upright 5 with four M8 x 68mm Bolts 73 two Small Support Plates 93 and four M8 Nylon Locknuts 83 4...

Страница 8: ...mm Bolt 91 and an M10 Nylon Locknut 84 See the inset drawing Make sure that the Pulley Bracket 51 is in front of the right Weight Guide 9 Tighten the M8 Nylon Locknuts 83 used in steps 4 and 5 7 6 9 8...

Страница 9: ...ormed Note The seat frame must be removed from the front upright before the Short Cable not shown is used See ATTACHING AND REMOVING THE SEAT below The Nylon Strap not shown can be attached in the sam...

Страница 10: ...ocess with the Speed Bag Arm Make sure the Punching Bag Arm 6 is on the same side of the weight system as the hole in the Stabiliser not shown refer to step 1 The Punching Bag should hang so that the...

Страница 11: ...e Long Cable 41 around a 90mm Pulley 45 Attach the Pulley and a pair of Pulley Covers 44 to the upper hole in the Long U bracket 50 with an M10 x 53mm Bolt 94 and an M10 Nylon Locknut 84 Make sure tha...

Страница 12: ...25 83 21 Wrap the Long Cable 41 around a 90mm Pulley 45 Attach the Pulley and a pair of Pulley Covers 44 to the bracket on the Top Frame 10 with an M10 x 53mm Bolt 94 and the M10 Nylon Locknut 84 Mak...

Страница 13: ...o four stages 1 frame assembly 2 arm assembly 3 cable assembly and 4 seat assembly The hardware for each assembly stage is packaged separately Wait until you begin each stage to open that parts bag Th...

Страница 14: ...155mm Bolt 91 M10 x 198mm Bolt 71 M8 x 45mm Bolt 75 M8 x 68mm Bolt 73 M8 x 59mm Bolt 77 M8 x 63mm Bolt 80 M8 x 117mm Bolt 78 M6 x 70mm Bolt 87 M6 x 50mm Screw 76 M6 x 63mm Screw 72 M6 x 16mm Screw 67...

Страница 15: ...x 50mm Inner Cap 53 1 25mm Square Inner Cap 54 4 19mm Round Inner Cap 55 3 50mm Square Inner Cap 56 6 45mm Square Inner Cap 57 2 38mm Square Inner Cap 58 4 M4 x 20mm Screw 59 2 Round Inner Cap 60 1 Se...

Страница 16: ...3 44 44 45 45 84 83 86 81 72 81 2 55 65 13 14 14 40 44 56 61 80 83 86 70 71 71 35 42 45 45 84 56 61 11 12 21 43 43 46 46 47 47 48 49 56 62 62 79 84 41 45 55 55 56 56 59 73 93 93 84 84 70 10 15 17 18...

Отзывы: