
3
2.2. Running Direction Setting
3. Cabinet Installation
According to the specific conditions of the site, select the barrier gate of the
appropriate specification, and use the expansion bolts to fix the cabinet on the ground
with 4 sets M16*150 expansion bolts. At the location where the cabinet is installed,
the barrier foundation should be made according to the site conditions, and the
cast-in-place foundation should be made for the non-concrete ground.
4. Controller Explanations and Instructions
All the electrical connections are done before delivery. The necessity is to connect the
power and grounding connection.