Installation
42
"run/stop switch" wire
Pin No.:25(signal), 32(ground). Install a switch with the two
wires.
Functional description: This switch controls the gas
shutoff valve status.
The two wires are labeled "RUN/STOP SWITCH", and
the wire cross-sectional area is 0.75 mm
2
.
"idle/rated switch" wire
Pin No.: 27(signal)
,
32 (ground). Install a switch with the
two wires.
Functional description: When the switch is on, the
speed rises to the rated speed. When the switch is off,
the speed decreases to idle speed.
The two wires are labeled "IDLE/RATED SWITCH",
and the wire cross-sectional area is 0.75mm
2
.
"speed bias/remote speed switch" wire
Pin No.:22(signal)
,
32 (ground). Connect the wires with
the speed control signal wire.
Functional description: When parallel or grid
connection is required, the signal line is connected to
the speed control signal wire.
The two wires are labeled
“SPEED BIAS/REMOTE
SPEED ", and the wire cross-sectional area is
0.75mm
2
.
"generator breaker switch" wire
Pin No.: 26
(
signal
)
, 32
(
ground
)
Install a switch with the two
wires.
Functional description: It is applied to the engine that
needs to be connected with the grid. When the grid starts
running, the signal switch needs to be on. When the grid is
opened, the signal switch needs to be off.
The ECU wiring harness reserves two wires for this switch,
the two wires labeled "GENERATOR BREAKER SWITCH",
using a wire cross-sectional area of 0.75mm
2
.
Figure 3.10.1 C- Wire for "Run/Stop switch"
Figure 3.10.1 D- Wire for "idle/rate switch"
Figure 3.10.1 E- Wire for "speed
Bias/remote speed switch"
Figure 3.10.1 F- Wire for "generator