4. Operation
The first engine commissioning process should be handled by
S. I. Moteurs Baudouin
ap-
proved personnel. The successful completion of this process, along with the checks and
adjustments required by
S. I. Moteurs Baudouin
, will ensure that the engine runs efficiently,
reliably, and safely.
Failure to comply with the installation and
operating instructions as defined by
S. I.
Moteurs Baudouin
will void the warranty.
People will be required to wear Individual Protection Equipment (IPE) and use correct tools
following official standards.
Make sure that the engine is correctly protected regarding its environment conditions.
Take the necessary measures for the emergency shut-off of the gas or air supply to prevent
from over-speed risks.
Check the cleanliness of circuits.
Check for free circulation of gases in exhaust ducts.
Check the natural gas supply.
Check coolant level and fill if necessary.
Check oil level and fill if necessary.
Check air-filter clogging indicator.
Pre-lubricate before engine start-up after an engine has been stopped longer than 24h,
for a shorter period, pre-lubrication is unnecessary.
Check the natural gas system
Ensure no electrical equipment, fire and heat source near the gas pipe.
Ensure the engine power is closed.
Visually check if the gas pipeline leaks
Open the gas valve, let the gas pass by the gas pipe line,
From the source to the mixer in the pipe joint measured with gas leak fluid leaks.
Measure the gas pipe from the source to the mixer with gas leak fluid leaks.