Installation and Operating Manual
Printed: 02/2015
3.2. Unloading by forklift truck or lifting trolley ....................................................................... 20
3.3. Unloading by crane .......................................................................................................... 21
3.4. Positioning by hand .......................................................................................................... 22
4. Installation of unit ..................................................................................... 22
4.1. Foundation / base frame .................................................................................................. 22
4.2. Structural vibration insulation .......................................................................................... 23
4.3. Installation of unit ............................................................................................................ 23
5. Assembly of unit ........................................................................................ 24
5.1.Preparation of unit assembly ............................................................................................. 24
5.2. Alignment of unit section ................................................................................................. 25
5.3. Connection of unit sections .............................................................................................. 25
5.3.1. Connection with external corner brackets .......................................................................... 25
5.3.2. Connection of unit sections from the inside with internal brackets ................................... 26
5.3.3. Roof joint connections for outdoor units ............................................................................ 26
5.4. Alignment of doors .......................................................................................................... 27
5.4.1. Adjustment of standard locking levers ................................................................................ 27
5.4.2. Adjustment at locking lever – MFG 150 .............................................................................. 28
5.4.3. Adjustment at hinge ............................................................................................................ 28
5.5. Dismantling of panels and panelling profiles ..................................................................... 29
5.6. Dismantling of frame profiles ........................................................................................... 29
5.7. Pre-assembled units ......................................................................................................... 29
6. Connections and operation ....................................................................... 31
6.1. Connection of heat exchanger .......................................................................................... 31
6.2. Connection of steam heater ............................................................................................. 32
6.3. Connection of refrigerant line ........................................................................................... 32
6.4. Condensate drain ............................................................................................................. 32
6.5. Air duct connections......................................................................................................... 32
Содержание DIWER EVO DP80 Series
Страница 2: ......
Страница 39: ...Installation and Operating Manual Page 37 Printed 02 2015...
Страница 62: ...Installation and Operating Manual Page 60 Printed 02 2015 Notes...
Страница 63: ...Installation and Operating Manual Page 61 Printed 02 2015 Notes...
Страница 64: ...Installation and Operating Manual Page 62 Printed 02 2015 Notes...