13
Power Up
Start by making sure the processor's Emergency STOP switch is in the OFF position.
Next, start the generator. Make sure it is running smoothly in high-speed manual mode before
plugging in the Rionfuser Electrofusion Processor. It is strongly recommended that the Rionfuser
Electrofusion Processor is the only device being powered by that generator. Do not use an extension
cord if it is at all possible. If an extension cord must be used, see page 30 for guidelines on selecting
an appropriately sized cord.
Plug the processor into the appropriately sized receptacle on the generator.
Press the Emergency STOP switch to turn the processor ON.
Test the GFCI by pressing the "Test" button followed by the "RESET" button.
After the processor has turned ON, startup screens similar to the following will be displayed one after
another:
After the INTERNAL SELF TEST, the processor will display the CONNECT LEADS screen. An exam-
ple of the CONNECT LEADS screen is shown below:
On the CONNECT LEADS screen, the second line indicates the major firmware version of the proces-
sor, in this case version 1.0.
General Operation
INTERNAL SELF TEST
VER: 1.2.3 SN: 8540123
CAL DUE - 05/112020
ADC
INTERNAL SELF TEST
VER: 1.2.3 SN: 8540123
CAL DUE - 05/112020
PASSED
Connect Leads
SW Ver 1.0
Temperature: +75° F
GEN: 120V 60.0Hz
If the processor does not turn OFF when the
"TEST" button is pressed and then back ON
when the "RESET" button is pressed, DO NOT
FUSE.