www.enware.com.au
© Enware Pty Ltd
Page 9
wall mounted single inlet
FS021 FS020
Rough In:
1. Secure one 1/2” BSP male fitting behind the finished wall,
allowing approx. 12mm of thread proud from finished wall.
Fit off:
2. If required, cut the 1/2” thread on wall so it is approx. 12mm
proud from finished wall.
3. Flush the line thoroughly before connecting tap fittings. Once the
line is clear of debris, proceed to next step.
4. To fit wall base mount, apply thread sealing tape onto the 1/2”
BSP male thread on wall. Seal any gaps between thread and
wall with silicone sealant. Screw wall base onto the 1/2” thread,
and tighten firmly. Make sure the wall base is fitted plumb (facing
straight up).
5. Proceed to Fitting Lever Handles – page 12