www.enware.com.au
© Enware Pty Ltd
Page 14
6. Check that the riser is sitting plumb both ways (front-
rear, right – left), and bracket is lined up straight
towards the wall. Then mark the two drill holes of the
bracket on the wall.
7. Drill the two marked holes in the wall and fix the
bracket onto wall using appropriate fixings.
8. Fit spring retainer/ hose/ spray gun assembly onto
riser.
9. Fit all grub screws back onto fittings, using the
2.5mm Allen key provided. Check that each grub
screw has engaged into the recess of the male
spigot, then tighten gently.
Before fully tightening the grub screw, check that
the pot filler is facing the preferred direction. (If spout
needs to swivel, tighten grub screw and then back
off slightly just enough for the spout to swivel. Do not
disengage screw more than half a turn. If grub screw
is not fitted correctly it may result in premature wear
or damage to the brass spigot.)
Ensure the spigot has engaged into the socket
properly. SEE IMAGE 39, 40
Ensure the grub screw has engaged into the
groove properly. SEE IMAGE 41, 42
IMAGE 37
IMAGE 39
IMAGE 41
IMAGE 38
IMAGE 40
IMAGE 42
7 TY
P
50 P.C.D.
INSTALLATION DETAIL
(WALL BRACKET CUTOUT)