Scheduled Testing, Inspection and Maintenance
1. Once de-energized the display will become inactive.
2. If removing only the valve use Step 4 from the “Actuator Removal”
3. Disconnect the pressure sensor (P1) and outlet sensor (FT1). Using a wrench remove the redundant
temperature (T1) from the pipe fitting.
4. Using either the shifting spanner or the gas grip loosen the three unions holding the valve in place
(see below).
Armature Clamping Nut
Support Plate Bolts
Actuator
BEFORE attempting to open Control
Module, a certified and qualified
electrician MUST fully de-energize and
disconnect all electrical power from
ADMS.
Perform required LOCK OUT/TAG OUT
procedures.
When done, reconnection and
reenergizing of ADMS
MUST
be
performed by certified and qualified
electrician.
DANGER
!
■
Valve Replacement
OMM-0126-0A
Page 66 of 71