14
Need help or have any questions? Call us at 1-714-963-0329 or send us an email to [email protected]
❑
Set the gear box assembly back into place and realign it.
❑
Install and tighten the three 3mm x 12mm wood screws to hold the gear box assembly securely to the fuselage.
☞
Be careful not to overtighten the screws or you might strip the plywood motor plate.
Step 2: Installing the Main Gear Wheels
☞
Double-check that the wheel spins without binding. If the wheel does bind, carefully pull the nylon wheel retainer
just far enough away from the wheel to prevent the binding.
❑
Repeat the procedure above to install the second wheel and wheel retainer.
❑
Slide one wheel onto one of the axles.
❑
Using needle nose pliers, carefully squeeze one nylon
wheel retainer onto the axle to secure the wheel into place.
If you would like to use a more to-scale lightweight foam wheel, we recommend using the 2-1/4" Dave Brown Treaded
Lectra-Lite Wheels P/N 218547. The axle hole in the wheels will have a larger diameter than the axles, but you can use
a piece of KNS aluminum or brass tubing as a bushing. Hold the wheels in place using either small wheel collars or by
simply bending the end of the bushings up at an angle.
❑
# 0 Phillips Head Screwdriver
❑
Adjustable Wrench
❑
Excel Modeling Knife
YOU'LL NEED THE FOLLOWING PARTS:
❑
(1) Plastic Cowling
❑
(3) 1.5mm x 4mm Wood Screws
❑
(1) 7.5 x 5 Propeller
SECTION 9: COWLING & PROPELLER INSTALLATION
❑
(1) 3mm Flat Washer
❑
(2) 3mm Hex Nuts
YOU'LL NEED THE FOLLOWING SUPPLIES:
❑
Scissors
❑
220 Grit Sandpaper w/Sanding Block
Step 1: Cutting Out the Cowling
❑
Using 220 grit sandpaper with a sanding block, carefully sand the back edge of the cowling smooth and straight.