
04.4
Interval: 50 operating hours
Air cooler(s)
Check draining of air cooler(s)
15.2.1
Check that the draining pipe is open, check if any leakage.
03.3.1
Cooling system
Check water level in cooling system
19
Check the water level in the expansion tank(s) and/or the
static pressure in the engine cooling circuits.
Connecting rod
Check tightening of the connecting rod screws
11.2.4
Check the tightening of the connecting rod screws after the
first 50 operating hours on a new engine and after overhaul,
those screws that have been opened.
Note!
Pump to stated pressure. Tighten if possible.
Do not
loosen.
07.3
Fuel and lubricating oil filters
Check pressure drop indicators
17.4
Change filter cartridges if high pressure drop is indicated.
03.3.1
23.1.3
Gauges and indicators
Take readings
03.3.1
Read and record (using eg. form No. WV98V009) all
temperature and pressure gauges, and at the same time
the load of the engine.
Governor, actuator
Check oil level in governor
02.2.4
Check oil level, and look for leaks, use governor manual.
22.4
Injection and fuel system
Check leak fuel quantity
03.3.1
Check the amount of leak fuel from the injection pumps
and nozzles.
Lubricating oil sump
Check oil level in sump
18.2
Check oil level by means of dip stick, compensate for
consumption.
02.2.
Main bearings
Check tightening of main bearing screws
10.2
Check the tightening of main bearing screws after the first
50 operating hours on a new engine and after overhaul,
those screws that have been opened.
Note!
Pump to stated pressure. Tighten if possible.
Do not
loosen.
07.3
Turbocharger
Water cleaning of compressor
15.1.5
Clean the compressor by injecting water.
03.3.1
Turbocharger
Check turbocharger oil level
15
(ABB VTR)
Check oil level, and look for leaks. Change oil after the first
100 service hours in both oil spaces, use TC:s manual.
02.2.5
Valve mechanism
Check valve clearances
12.2.4
Check the valve clearances after 50 hours’ running in new
and overhauled engines.
06.1
22-9845/III
Maintenance Schedule
04
MD, HF
04 - 3
Содержание Vasa R22
Страница 14: ...Appendix B Welding Precautions 200147 00 4...
Страница 42: ...02 Fuel Lubricating Oil Cooling Water 22 9601 02 22 VASA 22...
Страница 60: ...03 Start Stop and Operation 22 9632 03 12 VASA 22...
Страница 72: ...04 Maintenance Schedule 22 9845 III 04 12 MD HF...
Страница 92: ...06 II Adjustments Clearances and Wear limits 22 9601 06 6 VASA 22...
Страница 116: ...08 Operating Troubles Emergency Operation 22 9601 08 8 VASA 22...
Страница 143: ...Diagram for 8V22 balancing system 1 2 3 4 Fig 11 7 2211539545 22 9601 Crank Mechanism 11 VASA 22 11 17...
Страница 144: ...11 Crank Mechanism 22 9601 11 18 VASA 22...
Страница 156: ...12 Cylinder Head with Valves 22 9601 12 12 VASA 22...
Страница 164: ...13 Camshaft Driving Gear 22 9601 13 8 VASA 22...
Страница 172: ...14 Valve Mechanism and Camshaft 22 9601 14 8 VASA 22...
Страница 183: ...22 200520 Turbocharging and Air Cooling 15 VTR Turbocharger 15 11...
Страница 189: ...15 III Turbocharging and Air Cooling 22 8604 15 6 VTR 161 251 Turbochargers...
Страница 209: ...17 Fuel system 22 9601 17 8 VASA 22...
Страница 229: ...18 Lubricating Oil System 22 9601 18 20 VASA 22...
Страница 247: ...19 Cooling Water System 22 9601 19 18 VASA 22...
Страница 261: ...21 Starting Air System 22 9601 21 10 VASA 22...