![Warmhaus Minerwa 25 System IE Скачать руководство пользователя страница 5](http://html1.mh-extra.com/html/warmhaus/minerwa-25-system-ie/minerwa-25-system-ie_installation-and-service-manual_3434174005.webp)
5
warmhaus.com
CONTENTS
1. INTRODUCTION.................................................................................. 6
1.1.
BOILER DESCRIPTION...........................................................................6
1.2.
SAFETY INSTRUCTIONS: ......................................................................6
1.3.
TECHNICAL SPECIFICATION ............................................................... 8
1.4.
PRODUCT IDENTIFICATION .................................................................9
1.5. REGULATIONS .........................................................................................9
2. PRE-INSTALLATION ..........................................................................10
2.1.
PACKING CONTENTS ........................................................................... 10
2.2.
APPLIANCE OVERVIEW ...................................................................... 10
2.3.
LOCATION OF BOILER / CLEARANCE ..............................................11
2.4.
SYSTEM REQUIREMENTS ....................................................................12
2.4.1. GENERAL ......................................................................................................................... 12
2.5.
WATER SUPPLY (ONLY FOR COMBI BOILER) ................................12
2.6.
GAS SUPPLY ............................................................................................12
2.6.1. BY-PASS ............................................................................................................................ 12
2.6.2. VENTILATION.................................................................................................................. 12
2.6.3.
PRIMARY SYSTEM CLEANING ................................................................................... 12
2.7.
ELECTRIC SUPPLY .................................................................................12
2.8.
PRV DISCHARGE ....................................................................................12
2.9.
FLUE TERMINAL POSITION ................................................................13
3. INSTALLATION ..................................................................................14
3.1.
UNPACKING APPLIANCE .................................................................... 14
3.2.
APPLIANCE POSITION ........................................................................ 14
3.3.
WALL MOUNTING TEMPLATE ........................................................... 14
3.4.
PREPARING THE WALL – DRILL FLUE HOLE ................................ 14
3.5.
INSTALLING MOUNTING BRACKET ................................................. 14
3.6.
HANGING THE BOILER ........................................................................ 14
3.7.
APPLIANCE CONNECTIONS ...............................................................15
3.8.
FILLING APPLIANCE & ADDING INHIBITOR ...................................16
3.9.
INSTALLATION WITH HORIZONTAL FLUE SETS ...........................16
3.10.
INSTALLING THE FLUE SYSTEM ........................................................17
3.11.
INSTALLATION WITH VERTICAL
FLUE SETS (Ø60/100 MM) ..................................................................18
3.12.
CONCENTRIC FLUE KITS FOR
CONDENSING BOILERS (Ø60/100 MM) ........................................ 20
3.13.
PLUME DISPLACEMENT KITS Ø60 MM ...........................................21
3.14.
RECOMMENDATIONS OF PLUME KIT INSTALLATION..................21
3.15.
CONDENSATE CONNECTION ............................................................22
3.16.
MINERWA 25 SYSTEM – IE WIRING DIAGRAM ..............................26
3.16.1.
EXTERNAL CONTROL CONNECTION / LOW VOLTAGE INSTALLATION ..... 27
3.16.2. EXTERNAL CONTROL CONNECTION / LOW VOLTAGE INSTALLATION ..... 27
3.16.3. EXTERNAL CONTROL CONNECTION / SPLAN WIRING DIAGRAM .............. 28
3.16.4. EXTERNAL CONTROL CONNECTION / YPLAN WIRING DIAGRAM .............. 29
4. COMMISSIONING ..............................................................................30
4.1.
DISPLAY FUNCTION............................................................................ 30
4.1.1.
SET TRANSPARENT PARAMETERS MENU (TSP) ...............................................30
4.1.2. PARAMETERS ................................................................................................................. 31
4.1.3.
PARAMETER INFORMATION ..................................................................................... 36
4.2.
SERVICE MODE .....................................................................................36
4.3. CALIBRATION ........................................................................................37
4.3.1.
AUTO CALIBRATION.................................................................................................... 37
4.3.2.
AUTO CALIBRATION.................................................................................................... 38
4.3.3.
MANUAL CALIBRATION ............................................................................................. 39
4.3.4.
ESF (EASY START UP FUNCTION) ..........................................................................40
4.4.
INFORMATION MENU ACCESS ..........................................................42
4.5.
DEAERATION MODE ............................................................................43
4.6.
PRE-COMMISSIONING CHECKLIST ................................................. 44
4.7.
CHECKING INLET GAS PRESSURE .................................................. 44
4.8.
TESTING FOR GAS LEAKS DURING USE ....................................... 44
4.9.
CHECK GAS RATE ................................................................................ 44
4.10.
CIRCULATION PUMP ROTATION .......................................................45
4.11.
SETTING UP THE EXTERNAL CONTROLS ......................................45
4.12.
GAS CONVERSION FROM NG (G20) TO LPG (G31) .................... 46
4.13.
GAS CONVERSION FROM LPG (G31) TO NG (G20) .....................47
4.14.
CO/CO2 COMBUSTION CHECK .........................................................48
5.
SERVICING & PART REPLACEMENT ............................................. 49
5.1.
REPLACEMENT OF COMPONENTS - FIRST STAGE ......................49
5.2.
REPLACEMENT OF COMPONENTS - FINAL STAGE .....................49
5.3.
DRAINING THE BOILER / CH CIRCUIT ............................................49
5.4.
DRAINING THE BOILER / DHW CIRCUIT (ONLY FOR COMBI
BOILERS) ................................................................................................49
5.5.
FLUE THERMISTOR REPLACEMENT ............................................... 50
5.6.
IGNITION ELECTRODE REPLACEMENT ......................................... 50
5.7.
NOZZLE REPLACEMENT .................................................................... 50
5.8.
FLOW & RETURN THERMISTOR REPLACEMENT ...........................51
5.9.
INTERFACE PCB REPLACEMENT .......................................................51
5.10.
MAIN PCB REPLACEMENT ..................................................................51
5.11.
3-WAY INNER KIT REPLACEMENT - TOP ........................................51
5.12.
PUMP HEAD REPLACEMENT ..............................................................51
5.13.
OUTLET MANIFOLD REPLACEMENT ...............................................52
5.14.
WATER PRESSURE SENSOR REPLACEMENT ................................52
5.15.
3 BAR SAFETY VALVE REPLACEMENT ...........................................52
5.16.
DHW FLOW SENSOR REPLACEMENT
(FOR COMBI BOILERS ONLY) ...........................................................52
5.17.
DHW PLATE HEAT EXCHANGER REPLACEMENT
(FOR COMBI BOILERS ONLY) ...........................................................52
6.
FAULT CODES ................................................................................... 53
Содержание Minerwa 25 System IE
Страница 1: ...MinerWa 25 System IE CONDENSING SYSTEM BOILER INSTALLATION SERVICE MANUAL...
Страница 2: ...2 warmhaus com...
Страница 4: ......
Страница 26: ...26 warmhaus com 3 16 MINERWA 25 SYSTEM IE WIRING DIAGRAM WIRING DIAGRAM RISK OF ELECTRIC SHOCK...
Страница 57: ......