22
warmhaus.com
3.15. CONDENSATE CONNECTION
INTERNAL CONDENSATE PIPE DISCHARGE TERMINATION
Connection of a condensate discharge pipe
downstream of a sink, basin, bath or shower waste
trap.
1 - Boiler
2 - Visible air break
3 – 75 mm trap
4 - Visible air break and trap not required if there is
a trap with a minimum condensate seal of 75 mm
incorporated in the boiler in this case the 100mm is
measured to the trap in the boiler.
5 - Sink, basin, bath or shower.
6 - Open end of condensate discharge pipe direct into
gully 25mm min below grating but above water level:
end cut at 45 degree.
7 - Sink lip
8 - Minimum internal diameter 19mm
9 - Pipe size transition
10 - Minimum internal diameter 30mm
11 - Water/Weatherproof insulation
12 - Drain cover / leaf guard
INTERNAL CONDENSATE PIPE DISCHARGE TERMINATION
External termination to rainwater downpipe (NB only
combined foul/rainwater drain)
Connection of a condensate discharge pipe up-stream
of a sink, basin, bath or shower waste trap.
1 - Boiler
2 - Visible air break at plug hole – alternative connection
can be below sink trap
3 - 75 mm sink, basin, bath or shower waste trap
4 - Sink, basin, bath or shower with integral overflow
5 - Open end of condensate discharge pipe direct into
gully 25 mm min below grating but above water level;
end cut at 45 °
6 - Minimum internal diameter 19 mm
7 - Pipe size transition
8 - Minimum internal diameter 30 mm
9 - Water/weatherproof insulation
10 - Fit drain cover/leaf guard
Содержание Minerwa 25 System IE
Страница 1: ...MinerWa 25 System IE CONDENSING SYSTEM BOILER INSTALLATION SERVICE MANUAL...
Страница 2: ...2 warmhaus com...
Страница 4: ......
Страница 26: ...26 warmhaus com 3 16 MINERWA 25 SYSTEM IE WIRING DIAGRAM WIRING DIAGRAM RISK OF ELECTRIC SHOCK...
Страница 57: ......