Installation
[M2001452_0] - EN / 22.06.12
Page 9 of 20
Subject to change without notice
3
Installation
)
NOTE
The installation tasks may
only
be performed by a
qualified specialist (for example, roller shutter and
venetian blind builder/roller shutter and sun sha-
ding system mechatronics technician); this means
that the authorised qualified specialist described
below must have these special qualifications.
)
NOTE
The method of installation depends on the particu-
lar installation situation.
Installation into a cover panel
Installation of the top rail bracket directly on
the mounting substructure
The following installation steps are
not
contained
in these installation instructions and are described
in the installation instructions that accompany the
respective product.
Installation of the cover panel.
CAUTION
Product damage and malfunctions from incor-
rect installation!
In case of a later installation of the cover
panel, the top rail must be protected from
penetrating water.
At least two people are required for the instal-
lation.
)
NOTE
Application drawings must be followed.
WARNING
Risk of injury and falling!
Climbing aids must be positioned securely,
provide enough support and have a suffi-
ciently high load-bearing capacity.
When working at great heights, the approp-
riate provisions must be made to protect
against falling.
Under no circumstances should persons
use the external venetian blind as a means
of support.
3.1
Tools
Tool/aid
Size
Use
Tape mea-
sure/spirit level
Pencil/pointed ob-
ject
Pencilling in of fixing
points
Power drill
Fixing holes
Drill bits (collection)
Drilled holes (depen-
ding on substructure)
Drill bits (depending
on the substruc-
ture)
10
Power line
feedthrough
Drill bits (depending
on the substructure)
20
Power line
feedthrough
Hex key
Size
2.5
Hex key
Size 4
Turning the sprea-
ding wedge
Ratchet with
nut/open-end
spanner
Size
10
Combination pliers,
needle-nosed pliers
Cutting the tension
cable
Test cable
Trial run of external
venetian blind
Tab. 4:
Tools and their use