Installation
[M2001452_0] - EN / 22.06.12
Page 11 of 20
Subject to change without notice
d
d
2
0
0
0
0
3
9
0
7
L
Slat size = order di-
mension
Fig. 3:
Position of tension cable bracket (all dimensions in
mm)
Transfer the position of the external venetian blind to
the mounting substructure.
3.5
Mounting the bracket/top rail bracket
DANGER
Risk of injury from falling blind!
Select fixing material that is suitable for
the substructure.
Observe the listed weights when planning
the fixing material.
You must use the specified number of top
rail brackets.
The tensile force per tension cable must
be adhered to.
The fitter is responsible for the correct selection of fixing
materials and adhering to the installation specifications of
the fixing material manufacturer.
Mounting sub-
structure
Fixation suggestion
Concrete ≥ B15
Screw DIN 571-A2 6 x 60
Washer DIN 9021-A2 A6.4
Dowel S8
Aluminium/PVC
with steel core
Screw DIN 7976-A2 6.3 x 38*
Washer DIN 9021-A2 A6.4
Wood
Screw DIN 571-A2 6 x 40*
Washer DIN 9021-A2 A6.4
Transom and
mullion facade
Threaded bolt M 8
EPDM sealing washer
Stop nut DIN 934 M 8
Washer DIN 9021 A 8.4
Nut DIN 934 M 8
Tab. 6:
Fixation suggestions for brackets/top rail brackets
(selected mounting substructures)
* Screw with seal coating prevents water from penet-
rating into the screw connection.