Installation
[M2001452_0] - EN / 22.06.12
Page 16 of 20
Subject to change without notice
Attaching the tension cable brackets
)
NOTE
Check that the substructure is even by holding a
suitable tool (e.g. a spirit level) against it and cor-
rect any unevenness.
Mounting sub-
structure
Fixation suggestion
Aluminium
Screw DIN 7982 4.2 x 13
Masonry
Screw DIN 7997 4 x 40
Dowel S5
Wood
Screw DIN 7997 4 x 20
Thread
Screw DIN 965 M 4 x 8
Tab. 10:
Fixation suggestions for tension cable brackets
(selected mounting substructures)
Attach the tension cable
bracket to the substruc-
ture with suitable fixing
material.
Aligning the tension cable
Check the tension cable
brackets to ensure they
have the same height
(B) and are parallel
(X1 = X2 ± 1 mm).
Measure diagonals "D1"
and "D2". If D1 = D2,
the tension cables are
parallel and at right
angles.
Attaching the tension cable brackets
)
NOTE
Check whether the tension cable is conducted
through the punched cable holes on all slats and
on the bottom rail.
Mount the adjusting
screw on the tension
cable bracket by tighten-
ing the nut.
Guide the tension cable
through the adjusting
screw.
Manually tighten the
tension cable and make
a marking below the ad-
justing screw.
Tighten the tension
cable to the mark and
tension by an additional
4 mm. At the same time,
tighten the clamping
screw using a cross-
head screw driver.
Cut off the tension cable
approx. 20 mm below
the tension cable bra-
cket and deburr it.