SPEEDGATE Installation and Maintenance Manual
Revision 1 - MAY 2023
131
SPEEDGATE QUARTERLY CONTROL MAINTENANCE CHECKLIST
1-SPEEDGATE WEEKLY MAINTENANCE CHECKLIST
Checked
Good
Needs
Attention
N/A
5. Clean photo eyes (external entrapment protection
sensors) with a soft, clean, dry cloth and ensure
they are in good working order.
6�
If used in particular application:
Check that
the gate edges (external entrapment protection
sensors) are in good working order.
7�
If used in particular application:
Check that the
vehicle detection loops are working.
Comments/Recommendations:
Customer Signature:
Customer Name (Print):
Signature of Maintenance Inspector:
Maintenance Check Performed by (Print Name):
Date:
Date of next Maintenance Inspection:
Cycle Count:
SpeedGate Quarterly Control Maintenance Checklist
2-SPEEDGATE QUARTERLY (EVERY THREE MONTHS)
CONTROL MAINTENANCE CHECKLIST
Checked
Good
Needs
Attention
N/A
SpeedGate Serial Number:
To be carried out by maintenance personnel:
1. Perform a general visual inspection.
2. Visually inspect the Operator cabinet for moisture.
3. Visually inspect the Operators for moisture.
Содержание SPEEDGATE
Страница 48: ...48 wallaceperimetersecurity com Phone 866 300 1110 SPEEDGATE INSTALLATION...
Страница 52: ...52 wallaceperimetersecurity com Phone 866 300 1110 SPEEDGATE INSTALLATION...
Страница 59: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 1...
Страница 60: ......
Страница 61: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 2...
Страница 62: ......
Страница 63: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 3...
Страница 64: ......
Страница 102: ......
Страница 103: ......
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 107: ......
Страница 108: ......
Страница 109: ......
Страница 110: ......
Страница 111: ......
Страница 141: ......
Страница 142: ...115 Lowson Crescent Winnipeg Manitoba Canada R3P 1A6 Phone 866 300 1110 wallaceperimetersecurity com...