132
wallaceperimetersecurity.com
Phone: 866.300.1110
SPEEDGATE QUARTERLY GATE DRIVE SYSTEM MAINTENANCE CHECKLIST
2-SPEEDGATE QUARTERLY (EVERY THREE MONTHS)
CONTROL MAINTENANCE CHECKLIST
Checked
Good
Needs
Attention
N/A
4. Ensure that the Operator cabinet is secured
properly.
5. Clean the SpeedGate.
Comments/Recommendations:
Customer Signature:
Customer Name (Print):
Signature of Maintenance Inspector:
Maintenance Check Performed by (Print Name):
Date:
Date of next Maintenance Inspection:
Cycle Count:
SpeedGate Quarterly Gate Drive System Maintenance Checklist
3-SPEEDGATE QUARTERLY (EVERY THREE MONTHS)
GATE DRIVE SYSTEM MAINTENANCE CHECKLIST
Checked
Good
Needs
Attention
N/A
SpeedGate Serial Number:
All drive mechanism maintenance activities must be carried out by maintenance personnel or personnel
pre-approved by Wallace Perimeter Security and recorded in an equipment maintenance logbook.
1. Perform a general visual inspection.
2. Remove covers.
3. Grease drive linkage rod end bearing with lithium
grease or synthetic grease. Recommended
lubricant:
Castrol Pyroplex® Protection ES
4. Visually inspect the drive linkage for wear.
Содержание SPEEDGATE
Страница 48: ...48 wallaceperimetersecurity com Phone 866 300 1110 SPEEDGATE INSTALLATION...
Страница 52: ...52 wallaceperimetersecurity com Phone 866 300 1110 SPEEDGATE INSTALLATION...
Страница 59: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 1...
Страница 60: ......
Страница 61: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 2...
Страница 62: ......
Страница 63: ...PDXT PDXT C and PDTT Electrical Point to Point Diagrams 3...
Страница 64: ......
Страница 102: ......
Страница 103: ......
Страница 104: ......
Страница 105: ......
Страница 106: ......
Страница 107: ......
Страница 108: ......
Страница 109: ......
Страница 110: ......
Страница 111: ......
Страница 141: ......
Страница 142: ...115 Lowson Crescent Winnipeg Manitoba Canada R3P 1A6 Phone 866 300 1110 wallaceperimetersecurity com...