Fig. 18
Fig. 19
Latch
CAUTION
Should the cooker door jam and can not
be opened, DO NOT FORCE OR PRY the door as
damage will occur.
First, try lifting up on the bottom of the door at the
handle end to disengage the latch. If that does not
work, remove the right side panel. The striker that
catches on the door latch is located behind the front
face of the cooking cavity. Remove the striker nut (Fig.
20) this will release it from the panel.
1.
Remove
A.
Open the door.
B.
Remove screws from the top and bottom of
the door.
Fig. 20
C.
Pull the inner door panel out from the door
housing with the gasket plate and gasket
still attached.
D.
Remove the side edge screws (Fig. 21) that
secure the latch mechanism in the door.
E.
Remove the latch from the door.
Fig. 21
2.
Install
A.
Place the latch in the door and align the
mounting holes.
B.
Use screws to secure the latch in the door.
Tighten the screws hand tight.
C.
Align the inner door panel and secure in
place with screws. Tighten the screws hand
tight.
D.
Close the door.
3.
Adjust
A.
If necessary, loosen the nut and align the
striker with the slot pointing upwards.
B.
Finger tighten the nut.
C.
Close the door to center the striker in the
oval mounting hole.
D.
Open the door and check the strikers’ slot
for horizontal alignment (Fig. 22). The slot
on the striker must be kept horizontal in
order for the door latch to catch it properly
and latch.
VSX BOILER BASE SERIES CONVECTION STEAMERS - SERVICE PROCEDURES
F24627 (0916)
Page 30 of 82
Содержание ML-52163
Страница 46: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 46 of 82...
Страница 48: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 48 of 82...
Страница 50: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 50 of 82...
Страница 52: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 52 of 82...
Страница 54: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 54 of 82...
Страница 60: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 60 of 82...
Страница 62: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 62 of 82...
Страница 64: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 64 of 82...
Страница 66: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 66 of 82...
Страница 68: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 68 of 82...
Страница 70: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 70 of 82...
Страница 76: ...AUTO BLOWDOWN Fig 62 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 76 of 82...