background image

SERVICE PROCEDURES

Cabinet Bases

 Certain procedures in this section

require electrical test or measurements while power is
applied to the machine. Exercise extreme caution at
all times. If test points are not easily accessible,
disconnect power and follow lockout / tagout
procedures, attach test equipment and reapply power
to the test.

BOILER INSPECTION / CLEANING

CAUTION

 To ensure proper steamer operation,

periodic service must be performed as outlined in
these procedures.

It is recommended that the boiler be thoroughly
inspected for excessive scale and lime build up on a
quarterly basis. In hard water areas or for units heavily
used, a more frequent interval should be used. This
inspection consists of an internal examination and
cleaning of the boiler shell, an examination and
possible replacement of the descaler, a check of lime
build up on the water level sensing probes, and a
check of all boiler controls, including the pressure
switches.

 Read and follow the instructions on

the CLR bottle. Use plastic or rubber gloves to avoid
skin contact. If CLR liquid comes in contact with the
skin, rinse with clean water.

Clean-Out (All Boiler Models)

1.

Turn steamer OFF and drain boiler.

2.

Remove hand hole plate and gasket (top front)
from the boiler by removing the nut and clamp,
then tapping the cover lightly to free it while
holding the cover stud. This prevents the cover
from dropping into boiler.

3.

Remove old descaler retaining springs if present.

4.

With a wire brush, or equivalent, dislodge and
remove all loose scale from boiler shell. The
loose material must be either scooped from the
boiler or flushed through the drain.

5.

Check probe canister and float valve assembly
(regenerated models) for a scale build up and
clean as necessary.

6.

Check drain hole for obstructions.

7.

Install two new descalers.

NOTE: 

 Boiler water capacities vary between seven to

nine gallons for both gas and electric models
depending on the boiler size and BTU/KW rating.

NOTE: 

 If deliming solution accidently comes in

contact with steamer components, lightly rinse off with
clean water.

8.

Mix the deliming solution according to the
instructions for the chemical in use then add
solution to boiler as follows.

Models with Blowdown Timer.

 Mix the

solution in accordance with the instructions
on its container. Pour deliming solution into
boiler shell. Proceed to Step 9.

Models without Blowdown Timer.

 Turn off

the incoming water supply. Turn the unit ON
to close the drain valve. Mix the solution in
accordance with the instructions on its
container. Pour deliming solution into boiler
shell. Proceed to Step 9.

Models with Deliming Port Assembly.

Before mixing and pouring deliming solution
into boiler, clean the seating surfaces for the
hand hole gasket and then install a new
gasket. Position the hand hole plate and
tighten down. Turn off the incoming water
supply. Turn the unit ON to close the drain
valve. Mix the solution in accordance with
the instructions on its container. Open the
deliming assembly valve and pour the
deliming solution into the port (Fig. 9). Close
the deliming assembly valve and proceed to
Step 10.

Fig. 9

VSX BOILER BASE SERIES CONVECTION STEAMERS - SERVICE PROCEDURES

F24627 (0916)

Page 14 of 82

Содержание ML-52163

Страница 1: ...procedure you wish to perform to determine if you have the necessary tools instruments and skills required to perform the procedure Procedures for which you do not have the necessary tools instrument...

Страница 2: ...RE ADJUSTMENT 24 HEAT ELECTRIC MODELS 24 HEAT DIRECT STEAM MODELS 26 HEAT REGENERATED STEAM MODELS STEAM COIL 26 COOKING COMPARTMENT 27 CONTROLS 27 STEAM SUPPLY SOLENOID 27 WATER ACCUMULATING IN COMPA...

Страница 3: ...TS VSX24E 36E AND 42ET 71 SCHEMATIC DIRECT STEAMERS CABINET BASE VSX24D 36D AND 42DT 73 WIRING DIAGRAM DIRECT STEAMERS CABINET BASE VSX24D 36D AND 42DT 74 WIRING DIAGRAMS REGENERATED STEAMERS BOILER C...

Страница 4: ...codes are listed below Cal Code Construction Redundant controls in the electrical safety circuits that if tripped must manually be reset after the condition causing the trip subsides These controls co...

Страница 5: ...re rapid heat up of heavy cold loads the steam supply line must be sized to maintain pressure as outlined below DIRECT STEAM STEAMERS POTABLE REGENERATED STEAM STEAMERS NON POTABLE Supply Pressure 15...

Страница 6: ...temperature of these surfaces the precipitated minerals bake onto them and become very difficult to remove This causes several problems 1 Reduce the heat transfer efficiency of the heating system 2 C...

Страница 7: ...wait 5 minutes before relighting C Turn knob on gas combination control valve to ON If the water level in the boiler has reached the minimum level burners will ignite and begin to heat the water in t...

Страница 8: ...er 1 Open the cabinet door and turn main power switch ON The pilot light will illuminate NOTE On older models equipped with a manual ball type blowdown valve the valve must be closed for the boiler to...

Страница 9: ...ately 3 psi the pressure switch will open removing power from the cooking compartment controls 1 With both timer knobs at the off position open the compartment doors and observe that no steam has ente...

Страница 10: ...d its parts are hot Use care when operating cleaning or servicing the steamer The cooking compartment contains live steam Stay clear when opening each door Cabinet Base Boiler Controls For detailed in...

Страница 11: ...ness in the water indicates inadequate water quality and will cause failure of controls and the steamer Warranty does not cover malfunction due to poor water conditions Blowdown and or clean out the b...

Страница 12: ...ners A strainer is used in the water inlet line to prevent foreign matter from becoming lodged in the fill or cold water condenser solenoid valves and to keep unwanted particles out of the system A Y...

Страница 13: ...dicates steamer is in a cooking cycle Cooking Timer Used to set desired cooking cycle time between 0 60 minutes When a timer is set the steam supply solenoid valve is energized to allow steam into the...

Страница 14: ...and remove all loose scale from boiler shell The loose material must be either scooped from the boiler or flushed through the drain 5 Check probe canister and float valve assembly regenerated models...

Страница 15: ...into the port Close the deliming assembly valve and proceed to Step 3 3 Top compartments are to be in the OFF position Turn the boiler switch ON and open water valve if necessary 4 Allow boiler to op...

Страница 16: ...actor should be replaced CAUTION Be careful to note the location of each probe and the number of the wire connected to it Incorrectly connected wires will cause the controls to malfunction 3 Remove th...

Страница 17: ...ers with four heating elements the thermostat is located between the center pair of elements at the top of the elements Inspect the high limit thermostat and mounting surfaces as follows 1 Remove ther...

Страница 18: ...ect power leads off the solenoid valve being serviced NOTE It is recommended that the valve be removed from the unit for cleaning to prevent damage to the lines and fittings when the stem is removed f...

Страница 19: ...ove any debris found on the sealing surfaces 5 Reassemble and reinstall the valve 6 If valve still malfunctions replace it and recheck for proper operation BLOWDOWN SOLENOID VALVE DOES NOT DRAIN The p...

Страница 20: ...ller Clean as needed If clogging reappears the orifice should be removed cleaned and reinstalled Remove any other foreign objects that appear to be obstructing the gas orifice or air shutters Electric...

Страница 21: ...he thermocouple tip The flame should be about one inch long with half its length extending beyond the outer edges of the pilot shield If the pilot flame does not appear to be this length and color the...

Страница 22: ...finger tight 7 Check for proper operation Shut off the gas before servicing the unit All gas joints disturbed during servicing must be checked for leaks Check with a soap and water solution bubbles Do...

Страница 23: ...Burner 5 Ground 24VAC Neutral 6 24VAC Input 7 High Voltage This signal is supplied to spark electrode The pilot flame current is sensed by the module via the spark electrode high voltage wire and ter...

Страница 24: ...sure reading again If a pressure drop of inch water column or more is observed then the gas supply needs to be checked by the gas line installer or the local gas company for adequate sizing 7 If no ot...

Страница 25: ...terminals and verify it against the data plate voltage A If voltage is correct then proceed to Step 2 B If voltage is not correct check the following Fuses or breaker blown Power to contactor coils C...

Страница 26: ...tall A Look at the flange and tube mounting surfaces B If required clean the flange and tube mounting surfaces C Install a new gasket on the heating element D Inset the heating element in the unit and...

Страница 27: ...not easily accessible disconnect power and follow lockout tagout procedures attach test equipment and reapply power to the test CONTROLS For access to compartment controls remove the right side compar...

Страница 28: ...NNOT BE ACTIVATED When the power switch on boiler control box is ON set the timer knob to 2 minutes Both READY lights should go off COOKING lights should come on and steam should be entering both comp...

Страница 29: ...n screws until screw head touches gasket plate and at that point begin counting turns D Tighten all screws approximately two turns E Close the door and check unit for proper operation F If necessary t...

Страница 30: ...ove the side edge screws Fig 21 that secure the latch mechanism in the door E Remove the latch from the door Fig 21 2 Install A Place the latch in the door and align the mounting holes B Use screws to...

Страница 31: ...s base using a rag and vise grips F Tighten the striker nut hand tight plus a quarter turn Be careful not to damage the striker slot when tightening or door may not latch properly Fig 22 VSX BOILER BA...

Страница 32: ...LED With the HL 3 contacts close the boiler fill solenoid is energized and water begins filling the boiler Fig 24 When the water level reaches the LLCO probe the LLCO relay energizes and turns on the...

Страница 33: ...et switch contacts to energize the heat source auxiliary control ELECTRO MECHANICAL LOW LEVEL CUT OFF AND DIFFERENTIAL CONTROL The steamer is equipped with three water level sensing probes High Level...

Страница 34: ...n to shut off the heat source in case the water level drops below the LLCO probe A single LLCO probe identical to the LLCO probe on the main low level cut off control is connected to the auxiliary con...

Страница 35: ...valve ON Gas supply valve ON Gas combination control valve ON Control cycling pressure switch CLOSED High limit pressure switch CLOSED CWC thermostat OPEN Blowdown solenoid valve drain OPEN Boiler em...

Страница 36: ...nergized and LLCO LED S will remain ON until the water level drops below the LLCO probes or the power switch is turned OFF 4 Water reaches LL probe Power to terminal 2 on the water level control is pr...

Страница 37: ...e gas flow to the burners and the high limit failure light will come on This light will stay lit until the pressure drops below the lower limit set point of 6 PSI and the manual re set switch is press...

Страница 38: ...ts except CWC thermostat and CWC solenoid valve The CWC thermostat cycles as necessary to lower the discharge temperature of the water and condense steam going into the drain ELECTRIC MODELS This sequ...

Страница 39: ...pressure reaches 3 PSI approximately 14 minutes Green READY light turns ON NOTE If a cooking timer is set immediately after the green READY light comes on a loud clanking sound will be heard oil canin...

Страница 40: ...e cooking heating elements can go off The boiler is able to re pressurize to the upper set point even with both compartments in cook mode NOTE The CWC thermostat remains closed and CWC solenoid stays...

Страница 41: ...iler blowdown sequence starts The blowdown solenoid valve N O is de energized and valve opens to drain the boiler Power is removed from all components except CWC thermostat and solenoid valve The CWC...

Страница 42: ...Schematics Gas Steamers Boiler Controls VSX24G 36G and 42GT MANUAL IGNITION STANDARD CONTROLS VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 42 of 82...

Страница 43: ...ELECTRONIC IGNITION STANDARD CONTROLS VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 43 of 82 F24627 0916...

Страница 44: ...MANUAL IGNITION CSD 1 CODE CONTROLS VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 44 of 82...

Страница 45: ...ELECTRONIC IGNITION CSD 1 CODE CONTROLS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 45 of 82 F24627 0916...

Страница 46: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 46 of 82...

Страница 47: ...Wiring Diagrams Gas Steamers Boiler Controls VSX24G 36G and 42GT MANUAL IGNITION STANDARD CONTROLS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 47 of 82 F24627 0916...

Страница 48: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 48 of 82...

Страница 49: ...ELECTRONIC IGNITION STANDARD CONTROLS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 49 of 82 F24627 0916...

Страница 50: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 50 of 82...

Страница 51: ...MANUAL IGNITION CSD 1 CONTROLS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 51 of 82 F24627 0916...

Страница 52: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 52 of 82...

Страница 53: ...ELECTRONIC IGNITION CSD 1 CONTROLS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 53 of 82 F24627 0916...

Страница 54: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 54 of 82...

Страница 55: ...Schematics Electric Steamers Boiler Controls VSX24E 36E and 42ET AUTO BLOWNDOWN STANDARD CONTROLS Fig 42 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 55 of 82 F24627 0916...

Страница 56: ...AUTO BLOWNDOWN CAL CODE CONTROLS Fig 43 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 56 of 82...

Страница 57: ...AUTO BLOWNDOWN STANDARD CONTROLS Fig 44 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 57 of 82 F24627 0916...

Страница 58: ...AUTO BLOWNDOWN CAL CODE CONTROLS Fig 45 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 58 of 82...

Страница 59: ...Wiring Diagrams Electric Steamers Boiler Controls VSX24E 36E and 42ET AUTO BLOWDOWN STANDARD CONTROLS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 59 of 82 F24627 0916...

Страница 60: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 60 of 82...

Страница 61: ...AUTO BLOWDOWN CAL CODE CONTROLS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 61 of 82 F24627 0916...

Страница 62: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 62 of 82...

Страница 63: ...AUTO BLOWDOWN STANDARD CONTROLS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 63 of 82 F24627 0916...

Страница 64: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 64 of 82...

Страница 65: ...AUTO BLOWDOWN STEP DOWN TRANSFORMER STANDARD CONTROLS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 65 of 82 F24627 0916...

Страница 66: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 66 of 82...

Страница 67: ...AUTO BLOWDOWN STEP DOWN TRANSFORMER CAL CODE CONTROLS 2 CONTACTORS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 67 of 82 F24627 0916...

Страница 68: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 68 of 82...

Страница 69: ...AUTO BLOWDOWN STEP DOWN TRANSFORMER CAL CODE CONTROLS 4 CONTACTORS Sheet 1 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 69 of 82 F24627 0916...

Страница 70: ...Sheet 2 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 70 of 82...

Страница 71: ...ng Diagrams Electric Heater Circuits VSX24E 36E and 42ET STANDARD AND CAL CODE CSD 1 CONTROLS NEWER MODELS Fig 58 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 71 of 82 F24627 0...

Страница 72: ...STANDARD AND CAL CODE CONTROLS OLDER MODELS Fig 59 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 72 of 82...

Страница 73: ...3 PHASE 4 WIRE OLDER MODELS Fig 60 Schematic Direct Steamers Cabinet Base VSX24D 36D and 42DT VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 73 of 82 F24627 0916...

Страница 74: ...s Compartment Controls Wiring Diagram Direct Steamers Cabinet Base VSX24D 36D and 42DT See Wiring Diagram All Models Compartment Controls VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATIO...

Страница 75: ...Wiring Diagrams Regenerated Steamers Boiler Controls VSX36R and 42RT Older Models MANUAL BLOWDOWN Fig 61 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 75 of 82 F24627 0916...

Страница 76: ...AUTO BLOWDOWN Fig 62 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 76 of 82...

Страница 77: ...Schematic All Models Compartment Controls Fig 63 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION Page 77 of 82 F24627 0916...

Страница 78: ...Wiring Diagram All Models Compartment Controls Fig 64 VSX BOILER BASE SERIES CONVECTION STEAMERS ELECTRICAL OPERATION F24627 0916 Page 78 of 82...

Страница 79: ...to an open drain Steam generated inside compartment when timer is off Steam supply solenoid not fully closing clogged or dirty Replace the steam valve see FILL AND COLD WATER SOLENOID VALVES Timer co...

Страница 80: ...ply line Pressure relief valve leaking Steam supply lines leaking badly Steam trap malfunction Unit leaks water Loose water steam or drain line connections top or base Boiler hand hole gasket not seal...

Страница 81: ...y lit Gas pressure low See Manifold Pressure Adjustment Ignition module malfunction Check gas orifice for obstruction Pilot not lit or goes out Gas not on Low incoming gas pressure Check thermopile mi...

Страница 82: ...Ceramic flame rod insulator on ignitor cracked or damaged from extreme heat Ignition module not receiving power Ignition module malfunction VSX BOILER BASE SERIES CONVECTION STEAMERS TROUBLESHOOTING F...

Отзывы: