Service procedures - engine Group 21
22
TAD1630/TAD1631/TID162/TWD1620/
TWD1630/TD164
6
Remove the fuel delivery pipe and return fuel pipe together
with the clamps and brackets from the injectors and the in-
jection pump.
7
Fit protective plugs to all injectors and also to the pressure
valve holders in the injection pump.
8
Remove the pipe of the smoke limiter from the inlet pipe
(TAD1630P/V only).
Remove the inlet manifold (TAD1630, TAD1631 only).
10
11
On the cylinder heads which are to be removed, bend up the
locking tabs on the exhaust manifold bolts.
12
Remove the fuel return pipes together with the copper wash-
ers between the injectors.
13
Remove the valve cover.
Remove all pipes for distribution of coolants, and the thermo-
stat housing.
Содержание TAD1630G
Страница 1: ...Workshop manual TAD1630G GE P V TAD1631G GE TID162AP TWD1620G GH TWD1630G GE P V TD164KAE ...
Страница 2: ......
Страница 18: ...Design and Function Group 21 16 Engine Design and Function ...
Страница 80: ...Service procedures engine Group 21 78 Application of sealant to cylinder block ...
Страница 162: ...160 ...
Страница 164: ...7742302 English 10 2002 ...