Group 22
Service procedures - cooling system
143
Refitting
11
Fit new sealing rings (4) to the coolant pipe.
12
Fit the coolant pipe together with its connection
13
Remove the old sealing rings from the center plate of the
oil cooler. Fit new sealing rings.
14
Push the oil cooler onto the front coolant pipe.
15
Bolt the oil cooler to the center plate and the cylinder block.
16
Fit the rear coolant pipe to the oil cooler together with the
new sealing rings.
17
Fit the new seals to the coolant manifold.
18
Fit the manifold as one unit.
19
Restore the engine temperature sensor and the electrical
connections.
20
Fill with coolant.
21
Replace the oil lost when the oil cooler was removed.
22
Test the cooling system for leakage.
23
Start the engine and check for oil leaks.
Содержание TAD1630G
Страница 1: ...Workshop manual TAD1630G GE P V TAD1631G GE TID162AP TWD1620G GH TWD1630G GE P V TD164KAE ...
Страница 2: ......
Страница 18: ...Design and Function Group 21 16 Engine Design and Function ...
Страница 80: ...Service procedures engine Group 21 78 Application of sealant to cylinder block ...
Страница 162: ...160 ...
Страница 164: ...7742302 English 10 2002 ...