9 |
P a g e
o
Disconnect the IN line.
o
Connect the manometer to the IN line.
o
Reconnect the IN line.
o
Open the feed water supply and restart normal operation.
o
Observe the manometer during the Pure step. Pressure indicated by the manometer
should always be above 3 bar (43.5 psi).
o
If the inlet pressure is not meeting the required 3 bar (43.5 psi), adjust if possible or
conduct Voltea.
G.
System pump
o
Start normal operation.
o
Observe the system pump, confirm operation by checking if the pump vibrates during
the purification step.
NOTE:
If the feed pressure is enough for the unit to reach the
P. Flow Target
setpoint
the pump will remain inactive (no vibration).
Содержание DiEntry
Страница 1: ...Step by Step Alarm Troubleshooting...