38
CIP - Phase 4: Reassemble
24. Reconnect the syrup lines and bags of
syrup by pressing the syrup bag connector
onto the bag fitment.
25. Install the duckbill check valve into the
syrup line manifold and the syrup line
manifold into the coupler body.
26. Carefully align the pins of the syrup line
manifold with the syrup line connector and
insert the end of the 9-Tube Assembly fully
into the Coupler.
27. Push the coupler nut into the coupler body
and rotate the coupler body until motion
stops to secure.
28. Install the cap on the manifold.
29. Perform the “Assembling the Injector
Assembly” and “Installing the Injector
System” sections of the DAILY OPENING
PROCEDURES.
30. Empty and discard the remaining Stera-
Sheen sanitizer solution from the tank.
Rinse it out with water. Refill the sanitizer
tank with Flo-San sanitizer in the following
section “Refilling the Sanitizer Tank”.
31. Prime the syrup system as instructed in
“Priming the Syrup System.”
Содержание STOELTING Flavor Burst STL-40SS-JR
Страница 1: ...A VOLLRATH DIVISION Flavor Burst Soft Serve System Striped Junior Operator s Manual Manual No 513845 ...
Страница 2: ......
Страница 9: ...6 PAGE INTENTIONALLY LEFT BLANK ...
Страница 11: ...8 General System Overview Figure 1 ...
Страница 17: ...14 Syrup Pump and Related Parts Figure 4 ...
Страница 23: ...20 Spare Parts Kit Figure 7 ...
Страница 24: ...21 PAGE INTENTIONALLY LEFT BLANK ...
Страница 36: ...33 PAGE INTENTIONALLY LEFT BLANK ...
Страница 50: ...47 PAGE INTENTIONALLY LEFT BLANK ...
Страница 73: ......
Страница 74: ......