Technical Reference
Manual-XPM3m Revision Date: August 2014
CONVEYOR BELT, CHAIN & RAIL SERVICE
REMOVE AND REPLACE CONVEYOR BELT
DISCONNECTING THE CONVEYOR BELT
1. Locate the master link in the belt. The master link can be identified by the double size 'holes' in the belt. There
will be two double size holes located at the fourth link in from each end. There are five master links in the belt. The
single lane master link is the center link on the belt. The conveyor will have a belt with five single master links.
(instead of two triples and one single master link).
2. At the right side of the belt, locate the master link. Using screwdriver or chain nose pliers, unhook the left hook
of this master link from the belt. Then, using the same tool, unhook the right hook of the master link from the belt.
3. Using a screwdriver, lift the left side of the master link out of its position in the fourth link from the end on the
oven side of the belt. Using a screwdriver, unhook the right side of the master link from the belt.
4.
Locate the triple master link on the left side of the belt. Using screwdriver or chain nose pliers, unhook the right
hook of this master link from the belt. Now using the same tool, unhook the left hook of the master link from belt.
5. Using a screwdriver, lift the right side of the master link out. Using a screwdriver, unhook the left side of the
master link from belt.
6. Squeeze the ends of the triple master link together and slide the master link ends out of the oven side of the
second link in from the end.
7. At the right side of the belt, squeeze the ends of the triple master link together and slide the master link ends out
of the oven side of the second link in from the end.
8. The triple master links will stay in this position to reassemble the conveyor belt. Carefully lower the bottom end
of the conveyor belt taking care not to let it get caught anywhere
9. At the center of the belt, using a screwdriver, unhook the right side of the single link. Lift the unhooked side up
and remove the single master link from the belt. The belt will now separate. Unhook the bottom edge of the belt
from the driven shaft and lay it on the floor under the oven.
NOTE:
Use only single links for replacement.
Содержание XPM3m
Страница 79: ...Technical Reference Manual XPM3m Revision Date August 2014 LIGHT TOWER Continued ...
Страница 90: ...Technical Reference Manual XPM3m Revision Date August 2014 ENHANCED COOLING PACKAGE EC 1 FLOW DIAGRAM ...
Страница 92: ...Technical Reference Manual XPM3m Revision Date August 2014 ENHANCED COOLING PACKAGE EC 2 FLOW DIAGRAM ...
Страница 94: ...Technical Reference Manual XPM3m Revision Date August 2014 ENHANCED COOLING PACKAGE EC 3 FLOW DIAGRAM ...