![Vitrek 951i Скачать руководство пользователя страница 152](http://html1.mh-extra.com/html/vitrek/951i/951i_operating-and-maintenance-manual_1037506152.webp)
95x Series Operating Manual - May 17, 2022
Page
152
of
155
o
STEPRSLT?
for each defined step
–
giving very detailed information regarding each step.
•
If the user requires to run the sequence again (usually with a different DUT)
–
then simply repeat the
process starting with the
RUN
command
–
there is no need to reprogram the sequence itself unless
changes are needed.
If the user needs to synchronize the execution of the sequence to external events, the HOLD type step can be used
to cause the 95x to suspend execution of the sequence until the
CONT
command is received from the computer.
As an example, if the computer is controlling switching which needs to be altered during execution the user would
program the following during execution
–
•
Detect that the HOLD step is being performed by the response to the polled
STEP?
command.
•
If the HOLD step is being performed, then program the required change(s) to switches and send the
command
CONT
to the 95x to command it on to the next step in the sequence. The user may need to
perform a slight delay after sending the
CONT
command as it will take the 95x about 1ms to actually
continue on to the next step
–
if another STEP? command is received during that time then it will still
report that the HOLD step is being executed.