![Vitrek 951i Скачать руководство пользователя страница 130](http://html1.mh-extra.com/html/vitrek/951i/951i_operating-and-maintenance-manual_1037506130.webp)
95x Series Operating Manual - May 17, 2022
Page
130
of
155
Command
Description
ABORT-FORCE
Aborts a running test sequence when executing an ACW step, forces the
instrument to exit the discharge phase prematurely. This command
should only be used when the DUT setup cannot provide reliable high
voltage measurements.
CONT
Continues a running test sequence
Commands changing the test level or frequency while running a MANUAL sequence
AMPS,<NR3>
Sets the current test level of a running MANUAL test sequence
FREQ,<NR3>
Sets the test frequency of a running MANUAL test sequence
VOLTS,<NR3>
Sets the voltage test level of a running MANUAL test sequence
Active Test Sequence Information Query Commands
(Can only be used while not running a test sequence)
LEADS?
Responds with a <BOOL> indicating if the active test sequence contains
lead compensation data
NAME?
Responds with a <STRING> which is the name of the active test sequence
Active Test Sequence Status Query Commands
RUN?
Responds with a <BOOL> indicating if the active test sequence is being
run (1) or not (0)
SEQ?
Responds with a <NR1> which is the active test sequence # (-1 if none,
100 if defined by an interface, otherwise 0 through 99)
STEP?
Responds with a <NR1> indicating the step # presently being actioned in
a running test sequence (0 if none, otherwise 1 through 999)
PHASE?
Responds with a <NR1> indicating the step phase presently being
actioned.
0 - Not performing a step
1 - Ramping in a single controlled ramp (to within 5%)
2 - Settling to within 1% and pre-check delay
3 - Dwell, performing limit checks
4 - Discharging in a ramped manner to a safe level
5 - Discharging in a fast manner to a safe level
6 - Discharging in to a safe level at the fastest possible rate
7 - The only phase during a HOLD or PAUSE step
8 - The pre-switch identification phase of a SWITCH step
9 - The pre-switch delay phase of a SWITCH step
10 - Commanding the required switches
11 - The post-switch delay phase of a SWITCH step
Test Result Query Commands
(While running a test sequence)